My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10/13/2008 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2008
>
10/13/2008 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2014 3:02:18 PM
Creation date
5/15/2014 11:56:21 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/13/2008
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0e/1Sep, 17. 2008 8:12AM ass LIMA .CONSTRUCTION COMPANYDISTxicT No. 0230 P. 212 <br />Mn/DOT TP- 2460-0112 -42) <br />SHEET 1. OF 2 SI -EETS <br />State of Minnesota - Department of Transportation <br />CHANGE ORDER # 16 <br />State Project No.: 0280-55 <br />Contract No. Z07502 <br />Contractor. Lunde Construction Co. <br />Address: 15601 Clayton Avenue S. <br />Rosemount, MN 55068 <br />Location: In Lino Lakes on CSA.H 23 (Lake Dr. -) From 1000 ft south of Town Center Parkway to Apollo Dr. <br />itt aoccrrdeoce with the tams of this Contract, yon are hereby authorized and instructed to perform the Work as altered by the ;following provisions. <br />Upon reviewing the construction plans for the project it was discovered that grading items under Bridge No, 02817 were <br />omitted from the quantity tabrijations. <br />This Change Order directs the Contractor to furnish all equipment, materials and labor necessary to perform all grading <br />work in accordance with the additional plan sheet 81A. By signing thiA Change Order the Contractor acknowledges <br />receipt of plan. sheet $1A,. <br />All work will be performed in .accordance with the pertinent portions of the Special Provisions, Mn/DOT Standard <br />Spccincatiozrs,, Mn/DOT Standard Plates and as directed by the Engineer. <br />Payment to the Contractor for this work will be at the contract unit prices and negotiated prices as shown below in the <br />Estimate of Cost. <br />5STI MMAATE OF COST <br />increase — Contract Unit Items Group No, 1 <br />Item Nn, Description Unit Quantity Unit Price Amount <br />2575.502 Seed Mixture 250 Pound. 20 $2.50 $ 50.00 <br />2575511 Mulch Material Type 1 Ton 0.6 $200.00 $ 120.00 <br />2575.532 Fertilizer Type 3 Pound 101 $0.25 $ 2525 <br />2575,519 Disc Anchoring Acre 0.3 $100.00 $ 30.00 <br />Subtotal Increase $225.25 <br />_72_ <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.