My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10/13/2008 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2008
>
10/13/2008 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2014 3:02:18 PM
Creation date
5/15/2014 11:56:21 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/13/2008
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />06 / :Sep, 17. 2008, 8: 12AM 366LUNDA CONSTRUCTION COMPANYDISTJ,zicT No. 0230 P, 3)3 <br />MnIDOT TP- 2460- Q112 -92) <br />State of Mitmesota - Department of Transportations T 2 OF 2 SHEETS <br />CHANGE ORDER # 16 <br />Contractor: Linda Construction Co. <br />Address: 15601 Clayton Avenue S. <br />Rosemount, MN 55068 <br />State Project No.: 0280 -55 <br />Contract No. Z07502 <br />Location_ In Lino Lakes on CSAE 23 (Lake Dr.) From 1000 fft south of Town Center Parkway to Apollo Dr. <br />In accordance with the rents of this Contract, you are hereby authorized and insrmcted to perform the Work as altered by the following provisions. <br />Increase Negotiated Items- Group No.1 <br />All Items Include 10°% Prime Contractor Allowance <br />Item No. Description Milt Quantity 'Unit Price <br />2021.501 Prattalone Mobilization L.S. amount <br />1 $1,650•DO $1,650.00 <br />2021.501 Neat= Mobil+7ation L.S. 1 $1,430.00 <br />2105.501 Common Excavation (� $4,446 -87 <br />'D 217 (P) $19.11 $4,146.87 <br />2105.525 Top Sor7 Borrow (CV) CUM 166 (P) $22..32 $3,704.95 <br />2221.503 Aggregate Shouldering <br />Class 7 (CV) CUYD 98 (1') $4137 $4,054.26 <br />2501.567 24 "CS Safety Apron & <br />Grate Design (3148) Each 1 $.1,238.68 $1,238,68 <br />2501.567 24"RC Safety Apron & <br />Grate Design (3022) Eac11 1 $1,77352 $1,773,52 <br />2506.502 Const Drainage Structure <br />Design 60 -4020 Each 1 $2,895.20 $2,895.20 <br />2506516 Casting.Asecmbly A-7D Each 1 <br />$46150 $ 74s7sa <br />2.575.513 Mu1cb M.Elterial Type 9 CtJYD. 54 (P) 570.08 <br />$3.784.32 <br />Subtotal Increase $25,14530 <br />CEANGE IN CONTRACT TIlYEE <br />Due to this cringe the Contract Time: <br />. Is'ataase$- () by Wo E nhyR <br />Is decreased ( ) by Working <br />Is increased () by n Days <br />Is decreased ( ) by Calendar Days <br />h. Is riot changed (X ) <br />c. May ba revised if the work Affected <br />the controlling operation ( ) <br />TOTAL ESTIMATF:O INCREASE $25,37055 <br />Project/Resident/ otmty <br />Approved By: <br />City of LBO Lalms <br />Approved By- <br />Anoka County <br />Date <br />Date <br />Accepted 3y: <br />Contractor's uthorized Rspreseutative Data <br />Original to Project Engineer, copies to Contractor, City of Liao Lakes, Anoka County <br />—73— <br />
The URL can be used to link to this page
Your browser does not support the video tag.