Laserfiche WebLink
ESTIMATE NO. 3 <br />2008 SURFACE WATER MANAGEMENT PROJECT <br />CITY OF LINO LAKES, MINNESOTA <br />TKDA PROJECT N0.14043.003 <br />PERIOD ENDING: December 3, 2008 <br />ITEM CONTRACT QUANTITY UNIT AMOUNT <br />NO. DESCRIPTION UNIT QUANTITY TO DATE PRICE TO DATE <br />PROJECT 1 496 LONESOME PINE <br />1 MOBILIZATION EA 1.0 1.0 $ 400.00 $ 400.00 <br />2 <br />BUILD CATCH BASIN OVER EXISTING 2? ST. SEWER TYPE 409 EA 1.0 1.0 $ 4,131.00 $ 4,131.00 <br />3 4" PERFORATED DRAINTILE WITH ROCK & FABRIC WRAP LF 120.0 125.0 S 20.00 $ 2,500.00 <br />4 INSTALL YARD DRAIN BOX EA 1.0 1.0 S 3,450.00 $ 3,450.00 <br />5 TOPSOIL . CY 20.0 S 50.00 $ <br />6 SILT FENCE LF 30.D 20.0 $ 5.00 $ 100.00 <br />7 SPRINKLER REPAIR LS 1.0 $ 650.00 $ <br />B SOD SY 1,000.0 150.0 $ 4.00 $ 600.00 <br />• 9 DRAINTILE TEES WITH CAPS EA - 3.0 $ 150.00 $ 450.00 <br />• 10 REMOVE BUSH AT HOMEOWNER'S REQUEST LS 1.D $ 250.00 $ 250.00 <br />SUBTOTAL PROJECT 1 $ 11,861.00 <br />PROJECT 2 - OLD BIRCH STREET <br />1 MOBILIZATION EA 1.0 1.0 $ 400.00 $ 400.00 <br />2 CLEAN STORM SEWER PIPE LF 90.0 90.0 S 10.00 $ 900.00 <br />3 CLEANIOPEN STORM SEWER OUTFALL EA 6.0 6.0 $ 1,200.00 $ 7,200.00 <br />4 SEED / RESTORATION LS 1.0 1.0 $ 700.00 $ 700.00 <br />SUBTOTAL PROJECT 2 $ 9,200.00 <br />PROJECT 3 - BIRCH STREET <br />O 1 MOBILIZATION EA 1.0 _ $ 400.00 $ <br />2 COMMON EXCAVATION CY 40.0 S 75.00 S <br />3 SOD SY 200.0 - $ 4.00 $ <br />4 SILT FENCE LF 50.0 - $ 5.00 $ <br />SUBTOTAL PROJECT 3 $ <br />PROJECT 4 - RUFFED GROUSE COURT <br />1 MOBILIZATION EA 1.0 1.0 $ 400.00 $ 400.00 <br />2 CLEAN/OPEN STORM SEWER OUTFALL EA 1.0 1.0 $ 2,500.00 $ 2,500.00 <br />3 SEED/ RESTORATION LS 1.D 1.0 $ 1,000.00 $ 1,000.00 <br />• 4 DITCH TO DRAIN LF - 50.0 5 10.00 $ 500.00 <br />• 5 REMOVE CLUMP OF TREES LS 1.0 $ 500.00 $ 500.D0 <br />SUBTOTAL PROJECT 4 $ 4,906.00 <br />PROJECT 5 - OSPREY COURT <br />1 MOBILQAT1ON EA 1.D 1.0 $ 400.00 $ 400.00 <br />2 CLEAN/OPEN STORM SEWER OUTFALL ° EA 1.0 1.0 $ 2,500.00 $ 2,500.00 <br />3 SEED / RESTORATION LS 1.0 1.0 $ 550.00 S 550.00 <br />SUBTOTAL PROJECT 5 $ 3,450.00 <br />PROJECT B - HnDGSON ROAD <br />1 MOBILIZATION EA 1.0 1.0 $ 400.00 $ 400.00 <br />2 CLE WOPEN STORM SEWER OUTFALL EA 1.D 1.0 5 2,000.00 $ 2,000.00 <br />3 DITCHING LF 150.0 100.0 S 14.00 $ 1,400.00 <br />4 SEED / RESTORATION LS 1.0 1.0 $ 1,000.00 $ 1,000.00 <br />SUBTOTAL PROJECT 6 S 4,808.00 <br />MMIga 7 - I.AMOTTE CIRCLE <br />O 1 MOBILIZATION EA 1.0 1.0 $ 400.00 $ 400.00 <br />2 CLEAN STORM SEWER PIPE LF 500.0 500.0 $ 10.00 $ 5,000.00 <br />3 SEED / RESTORATION LS 1.0 1.0 $ 1,500.00 $ 1,500.00 <br />• 4 ADDITIONAL MOBILIZATION LS - 1.D $ 1,500.00 $ 1,500.00 <br />• 5 CLEAN/OPEN STORM SEWER OUTFALL LS 1.0 $ 2,500.00 S 2,500.00 <br />• 6 CLEAR AND GRUB BRUSH/SMALL TREES LS 1.0 $ 500.00 $ 500.00 <br />• 7 EXTEND OUTFALL PIPE LS 1.0 $ 300.00 $ 600.00 <br />• 8 PLACE RIP RAP, ABOUT 6 CY LS 1.0 $ 1,600.00 $ 1,600.00 <br />SUBTOTAL PROJECT 7 -1 6- S 13,809.00 <br />i <br />