Laserfiche WebLink
ESTIMATE N0. 3 <br />2008 SURFACE WATER MANAGEMENT PROJECT <br />CRY OF LINO LAKES, MINNESOTA <br />TImA PROJECT NO. 14043.003 <br />ITEM <br />NO. DESCRIPTION <br />PERIOD ENDING: December 3, 2008 <br />CONTRACT QUANTITY UNIT AMOUNT <br />UNIT QUANTITY TO DATE PRICE TO DATE <br />PROJECT s - PHEASANT RUN so uTH <br />1 MOBILIZATION EA 1.0 1.0 $ 400.00 $ 400.00 <br />2 CLEAR AND GRUB TREES EA 20 - $ 400.00 $ <br />3 SALVAGE & REINSTALL CHAIN LINK FENCE LF 200.0 - $ 6.00 $ <br />4 TOPSOIL BORROW CY 40.0 16.0 $ 50.00 $ 800.00 <br />5 SPRIPIKLER REPAIR LS 1.0 - $ 500.00 $ - <br />5 SOD SY 1,000.0 320.0 $ 4.00 $ 1,280.00 <br />7 DRAINTILE (Change Order Na 1) LF 100.0 100.0 $ 25.00 S 2,500 -00 <br />8 YARD DRAINT BOX (Change Order No. 1) EA 2.0 2.0 $ 1,500.00 $ 3,000.00 <br />9 LANDSCAPE ROCK (Change Order No. 1) LS 1.0 1.0 $ 1,500.00 $ 1,500.00 <br />SUBTOTAL PROJECT $ $ 1,480-00 <br />PROJECT 0 - MARVY STREET <br />1 MOBILIZATION EA 1.0 1.0 $ 400.00 $ ' 400.00 <br />2 CLEAN STORM SEWER PIPE LF 90.0 90.0 S 10.0D $ 900.00 <br />3 CLEANIOPEN STORM SEWER OUTFALL EA 1.0 1.0 $ 2,000.00 $ 2,000.00 <br />4 COMMON EXCAVATION CY 40.0 40.0 $ 40.00 $ 1,600.00 <br />5 SEED / RESTORATION LS 1.0 1.0 $ 1,500.00 $ 1,500.00 <br />SUBTOTAL PROJECT II $ 6,400.00 <br />PROJECT 10 - APOLLO MEADOWS <br />1 MOBILIZATION EA 1.0 1.0 $ 400.00 $ <br />2 PLACE RIP RAP AT FLARED ENDS CY 25.0 25.0 $ 200.00 $ 5. <br />3 SEED / RESTORATION LS 1.0 1.0 $ 2,000.00 $ 2,000 <br />• 4 CEAWOPEN STORM SEWER OUTFALL EA - 2.0 $ 1,500.00 $ 3,000.00 <br />SUBTOTAL PROJECT 10 $ 16,400.00 <br />11- 4TH AVENUE <br />1 MOBILIZATION EA 1.0 1.0 $ 400.00 $ 400.00 <br />2 CLEAN/OPEN STORM SEWER OUTFALL EA 1.0 1.0 $ 2.200.00 $ 2,200.00 <br />3 SEED / RESTORATION LS 1.0 1.0 $ 1,000.00 $ 1,000.00 <br />• 4 REMOVE AND DISPOSE TREE STUMPS LS - 1.D $ 400.00 $ 400.00 <br />SUBTOTAL PROJECT 11 $ 4,000 00 <br />PROJECT 12 70Th STREET AND NANCY DRIVE <br />1 MOBILIZATION EA 1.0 1.D $ 400.00 $ 400.00 <br />2 CLEAN STORM SEWER PIPE LF 200.0 200.0 $ 10.00 $ 2,000.00 <br />3 CLEAN/OPEN STORM SEWER OUTFALL EA 1.0 1.0 $ 2,200.00 $ 2,200.00 <br />4 SEED 1 RESTORATION LS 1.0 1.1) $ 1,000.00 $ 1,000.00 <br />SUBTOTAL PROJECT 12 $ 6'500.00 <br />1 MOBILIZATION EA 1.0 1.0 $ 400.00 $ 400.00 <br />2 PLACE RIP RAP AT FLARED END SECTIONS CY 5.0 6.0 $ • 250.00 $ 1,500.00 <br />3 SEED / RESTORATION LS 1.0 1.0 t 600.00 $ 600.00 <br />SUBTOTAL PROJECT 13 $ 2,500.00 <br />PROJECT 14 - PALOMINO TRAL DITCH WORM! <br />alIBIIe Ordsr No.11 <br />1 MOBILIZATION LS 1.0 1.0 $ 500.00 $ 500.00 <br />2 EXCAVATOR WITH OPERATOR HR 4.5 4.5 $ 150.00 $ nib <br />3 LABOR HR 13.5 135 $ 62.00 $ <br />4 MISCELLANEOUS MATERIALS LS 1.0 1.0 $ 100.00 $ 1117 <br />SUBTOTAL PROJECT 14 $ 2,112-00 <br />TOTAL ESTIMATE N0. 3 <br />_17_ <br />$ 88,523.00 <br />