Laserfiche WebLink
PERIOD ENDING: August 13, 2009 <br />ESTIMATE NO. 4(9 <br />2008 SURFACE WATER MANAGEMENT PROJECT <br />CITY OF LINO LAKES, MINNESOTA <br />TKDA PROJECT NO. 14043.003 <br />CONTRACT QUANTITY UNIT AMOUNT <br />NO. DESCRIPTION <br />ITEM UNIT QUANTITY TO DATE PRICE TO DATE <br />PROJECT 1 - 496 LONESOME PINE <br />1 MOBILIZATION EA 1.0 1.0 $ 400.00 $ 400.00 <br />2 <br />BUILD CATCH BASIN OVER EXISTING 21" ST. SEWER TYPE 409 1.0 1.0 $ 4,131.00 $ 4,131.00 <br />EA <br />LF <br />3 4" PERFORATED DRAINTILE WITH ROCK & FABRIC WRAP 120.0 125.0 $ 20.00 $ 2,500.00 EA 1.0 1.0 $ 3,450.00 $ 3,450.00 <br />4 INSTALL YARD DRAIN BOX CY 20.0 - $ 50.00 $ <br />6 TOPSOI 30.0 20.0 $ 5.00 $ 100.00 <br />6 SILT FEN CE L F 1.0 _ $ 650.00 $ <br />7 SPRINKLER REPAIR SY 1,000.0 150.0 $ 4.00 $ 600.00 <br />8 SOD EA - 3.0 $ 150.00 $ 450.00 <br />• 9 DRAINTIL.E TEES WITH CAPS - 1.0 $ 250.00 $ ` .00 <br />• 10 REMOVE BUSH AT HOMEOWNER'S REQUEST $ 11,881.00 <br />SUBTOTAL PROJECT 1 <br />PROJECT 2 - OLD BIRCH STREET 400.00 <br />1 MOBILIZATION 1.0 1.0 $ 400.00 $ <br />2 CLEAN STORM SEWER PIPE LF 90.0 90.0 $ 10.00 $ 900.00 <br />3 CLEAN/OPEN STORM SEWER OUTFALL EA 6.0 6.0 $ 1,200.00 $ 7,200.00 <br />4 SEED / RESTORATION LS 1.0 1.0 $ 700.00 $ 700.00 <br />$ 9,200.00 <br />SUBTOTAL PROJECT 2 <br />PROJECT 3 - BIRCH STREET 400.00 $ <br />1 MOBILIZATION EA 1.0 - $ <br />2 COMMON EX CY 40.0 S 75.00 $ CAVATION SY 200.0 - S 4.00 $ <br />3 SOD <br />4 SILT FENCE LF 50.0 - $ 5.00 $ - <br />$ <br />SUBTOTAL PROJECT 3 <br />PROJECT 4 - RUFFED GROUSE COURT <br />1 MOBILIZATION EA 1.0 1.0 $ 400.00 $ 400.00 <br />2 CLEAN/OPEN D / RESTORATION STORM SEWER OUTFALL EA 1.0 1.0 $ 2,500.00 $ 2,500.00 <br />3 SEED / RESTORATION L.S 1.0 1.0 $ 1,000.00 $ 1,000.00 <br />• 4 DITCH TO DRAIN LF - 50.0 $ 10.00 $ 500.00 <br />• 5 REMOVE CLUMP OF TREES LS 1.0 $ 500.00 $ 500.00 <br />$ 4,900.00 <br />SUBTOTAL PROJECT 4 <br />PROJECT 5 - OSPREY COURT <br />1 MOBILIZATION EA 1.0 1.0 $ 400.00 $ 400 00 <br />2 CLEAN/OPEN STORM SEWER OUTFALL EA 1.0 1.0 $ 2,500.00 $ 2,500.00 <br />3 SEED / RESTORATION LS 1.0 1.0 $ 550.00 $ 550.00 <br />$ 3,450.00 <br />SUBTOTAL PROJECT 5 <br />PROJECT 6 - HODGSON ROAD <br />1 MOBILIZATION EA 1.0 1.0 $ 400.00 $ 400.00 <br />2 CLEAN/OPEN STORM SEWER OUTFALL EA 1.0 1.0 $ 2,000.00 $ 2,000.00 <br />DITCHING DITCHING LF 150.0 100.0 $ 14.00 $ 1,400.00 <br />4 SEED / RESTORATION LS 1.0 1.0 $ 1,000.00 $ 1,000.00 <br />$ 4,800.00 <br />SUBTOTAL PROJECT 6 <br />PROJECT 7 - LAMOTTE CIRCLE <br />1 MOBILIZATION EA 1.0 1.0 $ 400.00 S 400-00 <br />2 CLEAN STORM SEWER PIPE LF 500.0 500.0 $ 10.00 $ 5,000.00 <br />3 SEED /RESTORATION LS 1.0 1.0 $ 1,500.00 $ 1,500.00 <br />• 4 ADDITIONAL MOBILIZATION L S - 1.0 $ 1,500.00 $ 1,500.00 <br />,� <br />• 5 CLEAN/OPEN STORM SEWER OUTFALL 1.0 $ 2,500.00 $ 2,500.00 <br />1.0 $ 500.00 $ 500.00 <br />EX <br />• 6 CLEAR AND GRUB BRUSH/SMALL TREES - 1.0 $ 800.00 $ 800.00 <br />• 7 EXTEND OUTFALL PIPE LS - 1.0 $ 1,600.00 $ 1.800.00 <br />• 8 PLACE RIP RAP, ABOUT 8 CY $ 13,800.00 <br />SUBTOTAL PROJECT 7 <br />i <br />