Laserfiche WebLink
• <br />PRELIMINARY COST ESTIMATE September 23, 2009 <br />BITUMINOUS STREET PAVING (7,230 LF @ 24' WIDE) <br />PINE STREET - LAKE DRIVE TO 4TH AVENUE /JODRELL STREET <br />LINO LAKES, MINNESOTA <br />PROJECT NO. 14292.005 <br />ITEM <br />NO. DESCRIPTION <br />UNIT <br />UNIT QUANTITY PRICE <br />AMOUNT <br />1 SALVAGE AND REINSTALL CULVERTS LF 40.0 $ 55.00 $ 2,200.00 <br />2 REPLACE CULVERTS LF 120.0 $ 65.00 $ 7,800.00 <br />3 SUBGRADE PREPARATION RS 72.3 $ 200.00 $ 14,460.00 <br />4 GRAVEL BASE FOR SHAPING TN 1,150.0 $ 18.00 $ 20,700.00 <br />5 2" BITUMINOUS BASE COURSE TN 2,300.0 $ 60.00 $ 138,000.00 <br />6 TACK COAT GA 1,000.0 $ 2.50 $ 2,500.00 <br />7 1 1/2" BITUMINOUS WEAR COURSE TN 1,750.0 $ 62.00 $ 108,500.00 <br />8 RCWD STORMWATER MANAGEMENT REQUIREMENTS LS 1.0 $ 20,000.00 $ 17,500.00 <br />9 EROSION CONTROL BLANKET CATEGORY 3 SY 500.0 $ 1.50 $ 750.00 <br />10 SEED / RESTORATION SY 750.0 $ 2.00 $ 1,500.00 <br />11 SILT FENCE LF 750.0 $ 2.00 $ 1,500.00 <br />SUBTOTOAL $ 315,410.00 <br />+5% CONTINGENCIES $ 15,590.00 <br />SUBTOTAL WITH CONTINGENCIES $ 331,000.0. <br />+20% ENGINEERING, LEGAL, ADMINISTRATION $ 67,500.00 <br />TOTAL ESTIMATED PROJECT COST $ 398,500.00 <br />• <br />