Laserfiche WebLink
• <br />PRELIMINARY COST ESTIMATE September 23, 2009 <br />BITUMINOUS STREET PAVING (11,630 LF @ 22' to 24' WIDE) <br />PINE STREET - LAKE DRIVE TO WEST END TERMINUS <br />LINO LAKES, MINNESOTA <br />PROJECT NO. 14292.005 <br />ITEM <br />NO. DESCRIPTION <br />UNIT <br />UNIT QUANTITY PRICE AMOUNT <br />1 SALVAGE AND REINSTALL CULVERTS LF 80.0 $ 55.00 $ 4,400.00 <br />2 REPLACE CULVERTS LF 120.0 $ 65.00 $ 7,800.00 <br />3 SALVAGE GRAVEL CY 850.0 $ 6.00 $ 5,100.00 <br />4 SELECT GRANULAR BORROW (CV) CY 2,550.0 $ 14.00 $ 35,700.00 <br />5 REPLACE SALVAGED GRAVEL CY 850.0 $ 6.00 $ 5,100.00 <br />6 SUBGRADE PREPARATION RS 116.3 $ 200.00 $ 23,260.00 <br />7 GRAVEL BASE FOR SHAPING TN 1,795.0 $ 18.00 $ 32,310.00 <br />8 2" BITUMINOUS BASE COURSE TN 3,720.0 $ 60.00 $ 223,200.00 <br />9 TACK COAT GA 1,600.0 $ 2.50 $ 4,000.00 <br />10 1 1/2" BITUMINOUS WEAR COURSE TN 2,815.0 $ 62.00 $ 174,530.00 <br />11 RCWD STORMWATER MANAGEMENT REQUIREMENTS LS 1.0 $ 35,000.00 $ 35,000.00 <br />12 EROSION CONTROL BLANKET CATEGORY 3 SY 500.0 $ 1.50 $ 750.00 <br />13 SEED / RESTORATION SY 1000.0 $ 2.00 $ 2,000.00 <br />14 SILT FENCE LF 1000.0 $ 2.00 $ 2,000.00 <br />• <br />• <br />SUBTOTOAL $ 555,150.00 <br />+5% CONTINGENCIES $ 28,350.00 <br />SUBTOTAL WITH CONTINGENCIES $ 583,500.00 <br />+20% ENGINEERING, LEGAL, ADMINISTRATION $ 116,000.00 <br />TOTAL ESTIMATED PROJECT COST $ 699,500.00 <br />