Laserfiche WebLink
Mn/DOT TP -2460 -0112 -92) <br />SHEET 2 OF 2 SHEETS <br />State of Minnesota - Department of Transportation <br />CHANGE ORDER # 18 <br />State Project No.: 0280 -55 <br />Contract No. Z07502 <br />Contractor: Lunda Construction Co. <br />Address: 15601 Clayton Avenue S. <br />Rosemount, MN 55068 <br />Location: In Lino Lakes on CSAH 23 (Lake Dr.) From 1000 ft. south of Town Center Parkway to Apollo Dr. <br />In accordance with the teens of this Contract, you are hereby authorized and instructed to perform the Work as altered by the following provisions. <br />• <br />Distribution: S.P. 0280 -55 Group 01 — 100% <br />CHANGE IN CONTRACT TIME <br />Due to this change the Contract Time: <br />a. Is increased ( ) by Working Days <br />Is decreased ( ) by Working Days <br />Is increased () by Calendar Days <br />Is decreased ( ) by Calendar Days <br />b. Is not changed (X ) <br />Issued By. <br />Project/Resident/Fiunty Engineer Date <br />Approved By <br />City of Lino Lakes <br />Approved By: <br />c. May be revised if the work affected Anoka County <br />the controlling operation ( ) <br />Date <br />Date <br />Accepted By 7\7%),‘ L. <br />Contractor's Authorized Representative Date <br />Original to Project Engineer, copies to Contractor, City of Lino Lakes, Anoka County <br />This Change Order is for known and anticipated <br />costs only. Should this change impact a controlling <br />item, schedule or work sequence, creating a delay or <br />an acceleration of the work, or cause us to incur <br />additional or indirect costs which are now unknown <br />and not anticipated, we reserve the right to an <br />additional ad ustrnent in the contract pace and/or <br />contract time. a L Pt CC,&S r_ �-• <br />6111-4 Ont‘ -/Orr <br />