My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09/28/2009 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2009
>
09/28/2009 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2014 10:47:26 AM
Creation date
5/27/2014 10:16:15 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
09/28/2009
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mn/DOT TP- 2460 - 0112 -92) <br />SHEET 1 OF 2 SHEETS <br />State of Minnesota - Department of Transportation <br />CHANGE ORDER # 18 <br />Contractor: Lunda Construction Co. <br />Address: 15601 Clayton Avenue S. <br />Rosemount, MN 55068 <br />State Project No.: 0280 -55 <br />Contract No. Z07502 <br />Location: In Lino Lakes on CSAH 23 (Lake Dr.) From 1000 ft. south of Town Center Parkway to Apollo Dr. <br />In accordance with the terms of this Contract, you are hereby authorized and instructed to perform the Work as altered by the following provisions. <br />At approximately on the west side of C.S.A.H. 23 at station 22+00 (Rice Creek Box Culvert) the adjacent <br />shoulder is showing erosion failure (20 ft X 4 ft) as well as the south Rip Rap ditch draining to the creek is <br />showing a depression due to erosion undermining the Rip Rap. <br />After review the Project Engineer has determined due to the sensitivity of the Marshan lake /wetlands this area <br />of repair shall be immediately repaired. <br />The C.S.A.H. 23 shoulder repair approximately (20 ft X 4 ft) shall be excavated approximately 14 inches and <br />than backfilled with a blended combination of crushed aggregate (1.5" minus) and compost material (two 6" <br />lifts compacted). Followed with shingled sod placed to a finish grade that is below the inplace bituminous <br />shoulder grade. <br />The south Rip Rap ditch channel draining to Rice Creek as shown in the attached plan shall have pea rock cast <br />over the area to fill only the voids and not cover existing rip rap (approximately 2 cyds). After placement of pea <br />rock both the north and south rip rap channels draining to Rice Creek shall have an annual rye grass (10 lbs) <br />cast through the area. <br />This Change Order directs the Contractor to furnish all equipment, materials and labor necessary to repair the <br />above described areas of erosion. <br />All work will be performed in accordance with the pertinent portions of the Special Provisions, Mn/DOT <br />Standard Specifications, Mn/DOT Standard Plates and as directed by the Engineer. <br />Payment to the Contractor for this work will be at the Mn/DOT 1904 Force Account, as shown below in the Estimate of <br />Cost: <br />Force Account <br />Description <br />Erosion Repair Areas <br />• <br />ESTIMATE OF COST <br />Amount <br />$4,500.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.