My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/09/2001 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2001
>
05/09/2001 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2014 10:09:00 AM
Creation date
6/2/2014 11:24:46 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
05/09/2001
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.TKDA <br />• <br />• <br />TOLTZ, KING, DUVALL, ANDERSON <br />AND ASSOCIATES, INCORPORATED <br />ENGINEERS • ARCHITECTS • PLANNERS <br />MEMORANDUM <br />1500 PIPER JAFFRAY PLAZA <br />444 CEDAR STREET <br />SAINT PAUL, MINNESOTA 551 01 -21 40 <br />PHONE: 651/292 -4400 FAX: 651/292 -0083 <br />To: John Powell Reference: Saddle Club <br />Copies To: Lino Lakes, Minnesota <br />From: Jason Wedel <br />Date: April 30, 2001 Commission No. 11985 -012 <br />I have reviewed the revised preliminary plans for the Saddle Club received on April 6, 2001. I <br />have the following comments: <br />1. The soil boring elevations must be converted from relative elevations to mean sea level <br />elevations. <br />2. The proposed street connection to Old Birch Street crossed property not included in the <br />plat. There must be dedicated right -of -way for the entire street. <br />3. The watermain located in the cul -de -sacs must be labeled as 8 -inch DIP Cl. 52 <br />watermain. The watermain size will have to be reduced to 6 inch before the connection <br />to the hydrants. <br />4. Sanitary sewer manhole MH5 does not meet the minimum depth requirement of 9 feet. <br />Any sanitary sewer that does not have at least 7 feet of cover must be insulated. <br />5. The City border must be removed from the details. <br />6. The utility plan must include an 8 -inch sanitary sewer and an 8 -inch watermain stub for <br />future extension on Old Birch Street to the north. <br />7. The 10 -year storm water calculations still need to be provided for the predevelopment <br />and the post development conditions. <br />8. The normal water and high water elevations need to be shown on the grading plan for the <br />wetland located in the southwest corner of the plat. <br />9. The time of concentration computations must be submitted. <br />10. The detail for the outlet structure says to see the plan for the pipe sizes, but the plan does <br />not provide this information. <br />11. The storm sewer information must be included on the plan. This includes the pipe sizes, <br />lengths, and slopes. <br />An Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.