My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/09/2001 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2001
>
05/09/2001 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2014 10:09:00 AM
Creation date
6/2/2014 11:24:46 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
05/09/2001
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />John Powell Page 2 April 30, 2001 <br />Saddle Club <br />12. Storm sewer computations must be submitted. The rational method is acceptable for <br />storm sewer calculations. Residential storm sewer design is to be based on a 5 -year <br />storm. <br />13. A riprap detail must be included in the plans for the pipe outlet as well as the weir. <br />14. The riprap that is shown in Nurp Basin B must be moved to the pipe outlet into the pond. <br />If you have any questions or comments regarding this review, please contact me. <br />
The URL can be used to link to this page
Your browser does not support the video tag.