Laserfiche WebLink
• <br />• <br />• <br />John Powell Page 2 April 30, 2001 <br />Saddle Club <br />12. Storm sewer computations must be submitted. The rational method is acceptable for <br />storm sewer calculations. Residential storm sewer design is to be based on a 5 -year <br />storm. <br />13. A riprap detail must be included in the plans for the pipe outlet as well as the weir. <br />14. The riprap that is shown in Nurp Basin B must be moved to the pipe outlet into the pond. <br />If you have any questions or comments regarding this review, please contact me. <br />