Laserfiche WebLink
• <br />• <br />Kohl's <br />Kohl's is proposed to be constructed of masonry materials that include predominantly <br />brick on the front with a stucco accent pattern at the entrances. The sides and rear of <br />the building transitions to block. As stated with the proposed Target elevation, the rear <br />of the building is very visible to the area to the north and more attention should be paid <br />to the design and materials used. <br />Park Dedication <br />Park dedication will be cash fees in lieu of land and should be provided at the rate in <br />effect at the time of the final plat. The current rate is based on a formula of $133 per <br />1,000 square feet of building, or approximately $44,000. <br />Signs <br />A total sign package has been proposed that includes wall signage as well as <br />freestanding signs. The narrative and the example submitted for the pylon signs are not <br />consistent. The signs are subject to a separate review and sign permit through the City. <br />Under the PDO staff would anticipate flexibility in the allowable signage as long as it is <br />submitted as a total package. No signage should be allowed on the rear of any <br />businesses facing the adjacent residential area. <br />Preliminary Plat <br />The application includes a preliminary plat for the site. The plat as submitted proposes <br />nine lots plus four outlots. The lots are created to provide individual lots for each <br />proposed user. Several of the lots do not have frontage on a public road so appropriate <br />easements regarding access, parking and circulation will have to be provided. The <br />minimum lot size in the SC zoning district is 3 acres. Under the PDO this provision <br />would be waived. <br />Environmental Assessment Worksheet <br />Based on the size of the proposed project, an Environmental Assessment Worksheet <br />(EAW) is mandatory. This process is designed to identify significant environmental <br />effects that may require a more detailed environmental impact statement. <br />Based upon Chapter 4410.3100 of the administrative rules governing environmental <br />review, a project may not be started and a final governmental decision may not be <br />made to grant a permit, approve a project or begin a project until a negative declaration <br />on the need for an EIS is made. While a draft EAW document has been submitted, the <br />document has not been processed through the City or Environmental Quality Board. <br />Until the process is complete and the City has determined that an EIS is not necessary <br />the City should not take action to approve the project. <br />Ryan Companies <br />Target Superstore <br />Page 5 of 6 <br />