My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07/11/2001 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2001
>
07/11/2001 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2014 11:05:27 AM
Creation date
6/3/2014 10:38:10 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
07/11/2001
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 11. The Convenience Store (Lot 1), Fast Food (Lot 2), Bank (Lot 8), and Buildings B <br />(Lot 4) and E (Lot 5) shall require Site Plan Review approval in accordance with <br />Section 2, Subd. 5 of the Lino Lakes Zoning Ordinance. <br />12. The secondary access and intersection located adjacent to Lots 1, 2, 4, and 5 <br />shall be redesigned to eliminate the proposed offset and angle to improve site <br />circulation and reduce vehicle conflicts and confusion. <br />13. The Kohl's parking lot shall be modified to minimize access points to the Apollo <br />Drive Extension and to include landscaping islands adjacent to the proposed <br />handicap stalls. <br />14. All required plan changes shall be completed prior to the final plan review by the <br />City Council. <br />ATTACHMENTS <br />1. Site Plans dated June 29, 2001 <br />2. City Engineer's Review <br />3. June 7, 2001 Staff Report <br />4. June 18,2001 NAC Memo <br />• <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.