My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07/11/2001 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2001
>
07/11/2001 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2014 11:05:27 AM
Creation date
6/3/2014 10:38:10 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
07/11/2001
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•TKDA <br />TOLTZ, KING, DUVALL, ANDERSON <br />AND ASSOCIATES, INCORPORATED <br />ENGINEERS • ARCHITECTS • PLANNERS <br />• <br />July 6, 2001 <br />Mr. Jeff Smyser <br />City Planner <br />City of Lino Lakes <br />600 Town Center Parkway <br />Lino Lakes, Minnesota 55014 <br />Re: Preliminary Plat Review — Lino Lakes Marketplace <br />City of Lino Lakes, Minnesota <br />TKDA Commission No. 11985 -012 <br />Dear Mr. Smyser: <br />1500 PIPER JAFFRAY PLAZA <br />444 CEDAR STREET <br />SAINT PAUL, MINNESOTA 551 01 -21 40 <br />PHONE: 651/292 -4400 FAX: 651/292 -0083 <br />We have completed our review of the Lino Lakes Marketplace preliminary plat submittal <br />received by the City on June 29, 2001. Previous submittals were received by the City on January <br />16, 2001, and April 9, 2001. The Lino Lakes Marketplace subdivision is located on the northeast <br />corner of Lake Drive and I -35W. The subdivision consists of a total of 40.158 acres of <br />undeveloped property that are to be subdivided into 10 PDO conditional use lots. <br />The submittal documents for the PDO consist of a topographic survey, preliminary plat, <br />preliminary tree preservation plan, preliminary site plan, preliminary grading and drainage plan, <br />preliminary utility plan, preliminary lighting plan, preliminary landscape plan, and preliminary <br />site infiltration plan. A project narrative as well as Site Lighting Fixture specifications were also <br />submitted. <br />At this time we cannot recommend approval of these submittals. We are requesting that the <br />enclosed observations and comments be addressed by the developer and re- submitted for a <br />subsequent review. <br />From our review of the Lino Lakes Marketplace preliminary plat submittal, we have the <br />following observations and comments: <br />Drainage / Storm Sewer Computations / Erosion Control <br />1. The City of Lino Lakes requires that the 1 -, 10 -, and 100 -year storm calculations be provided <br />for both the predevelopment and post - development runoff. To date, the City has only <br />received the 1- and 100- year storm calculations. The 10 -year storm calculations still need to <br />be provided. In addition, the storm calculations that were provided model the use of a 2" <br />An Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.