My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07/11/2001 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2001
>
07/11/2001 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2014 11:05:27 AM
Creation date
6/3/2014 10:38:10 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
07/11/2001
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
From to 9822499 at 6/28/01 11:29 AM Pg 006/009 <br />• <br />• <br />• <br />Permit Application No. 01 -05 Glenn R. Rehbein, et. al. <br />13. Revisions to (Wetland) Mitigation Plans prepared by Peterson <br />Environmental Consulting, Inc., dated June 14, 2001, received <br />June 15, 2001. <br />14. Wetland Replacement Plan continents prepared by MnDNR, dated <br />June 21, 2001, received June 25, 2001. <br />15. Preliminary storm water calculations prepared by Parsons <br />Transportation Group, Inc., dated April 9, 2001, received April 11, <br />2001. <br />16. Subsurface boring log prepared by American Engineering & <br />Testing Inc. Soil borings performed on 12/14/00, 12/15/00 and <br />12/18/00, received January 18, 2001. <br />17. RCWD Permit Files 99 -108, 96 -161, 77 -94. <br />Findings: 1. Proposed project entails development of an existing undeveloped <br />40 -acre lot into a commercial center with a Target Super Store and <br />8 retail buildings. The site ultimately discharges to George Watch <br />Lake via a culvert under I -35W. Proposed project will result in <br />approximately 29 acres of new impervious area in the form of <br />buildings, parking lots, and roadways. <br />2. Currently proposed storm water management plan includes <br />excavation of one detention (NURP) basin located on the north <br />side of the site and four smaller bio- retention /infiltration basins <br />located along the west side of the site. <br />The bio- retention/infiltration basin in the northwest corner of the <br />site is intended to serve future Lake Drive street improvements. <br />The remaining four basins (one NURP basin and three bio - <br />retention/infiltration basins) are intended to serve the proposed <br />development. Additional stormwater features include an <br />infiltration trench, a bio -swale and depressed islands. <br />As currently proposed, the detention (NURP) basin is designed in <br />accordance with District water treatment requirements. However <br />there does not appear to be a reason to excavate the basin to an <br />elevation of 880 feet making the NWL depth eight feet deep. <br />The detention pond is also designed in accordance with the District <br />rate control requirements. Hydrologic calculations for the 1- and <br />100 -year events demonstrate that there is a decrease in discharge <br />rates from existing to proposed conditions. Additional modeling <br />will be required to establish 1 -IWL's for the 100 -year event for the <br />6/27/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.