My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07/11/2001 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2001
>
07/11/2001 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2014 11:05:27 AM
Creation date
6/3/2014 10:38:10 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
07/11/2001
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
From to 9822499 at 6/28/01 11:29 AM Pg 007/009 <br />• <br />• <br />Permit Application No. 01 -05 Glenn R. Rehbein, et. al. <br />four bio- retention/infiltration basins in order to verify first floor <br />elevations of surrounding buildings. <br />3. There are two wetland basins identified along the East property <br />boundary. Basin A, in the southeast corner, is a 3.63 -acre Type II <br />wetland. Basin B, in the northeast corner, is a 1.24 -acre Type III <br />wetland. A third basin was located during an onsite review of TEP <br />and District stag. This basin may qualify for incidental wetland <br />exemption but further documentation must be provided by <br />Applicant. <br />As currently proposed, the project would entail 2.48 acres of fill <br />and 1.15 acres of excavation in wetland Basin A. There is no <br />proposed impact to wetland Basin B. <br />According to the Wetland Permit Narrative, a total of 6.11 acres of <br />wetland replacement is required for the Lino Lakes Marketplace. <br />The 2.48 acres of wetland fill will be replaced at a 2 to 1 ratio per <br />the WCA rules and the 1.15 acres of excavation will be replaced at <br />1 to 1. The wetland replacement requirement for the 1.15 acres of <br />excavation is based upon the RCWD rules, which require 1 to 1 <br />acreage replacement for adverse impacts to wetlands that are not <br />regulated under WCA. <br />A total of 6.3 acres of mitigation is being provided, consisting of <br />3.7 acres of New Wetland Credit (NWC) and 2.625 acres of Public <br />Value Credit (PVC). The proposed wetland replacement plan <br />consists of created wetlands at two sites located within the <br />Chomonix Golf Course Property (Mitigation Sites B and F) and a <br />third on county parkland south of the park reserve campground, <br />east of the Centerville Lake Beach (Mitigation Site E). A <br />preliminary review of the 1998 Calibration Study indicates that <br />Mitigation Sites B and F may not be within the same subwatershed <br />(MRC -9) as the proposed impact. <br />Proposed infiltration BMPs to be incorporated on -site include: <br />• Four bio- retentionJinfiltration basins. The northwest basin <br />is intended to serve future Lake Drive Street improvements. <br />The remaining three basins (located along the west side of <br />the site) are intended to serve this development. <br />• A bio -swale north of Target upstream of the NURP Basin. <br />• An infiltration trench along the entire north and east <br />parking lot curbs surrounding Target. <br />• Depressed islands are located throughout the development <br />site. <br />6/27/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.