My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/08/2001 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2001
>
08/08/2001 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2014 3:47:55 PM
Creation date
6/3/2014 12:20:22 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
08/08/2001
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />Planning & Zoning Board <br />July 11, 2001 <br />Page 19 <br />15. Dedication of access control to Anoka County should be shown on the plat <br />along Lots 1, 2, 3 and Outlot C adjacent to Lake Drive. The opening <br />width for the secondary access will need to be determined by Anoka <br />County. <br />16. The development agreement shall incorporate a cross access and <br />ingress /egress easement should be provided for the remnant parcel located <br />between Apollo Drive and Lots 3 and 4. <br />17. The sidewalk shall be extended on Lot 8 to the southerly property line. <br />18. A concrete pavement treatment shall be used for crosswalks on major <br />drive lanes. <br />Tom Palmquist, representing Ryan Companies, stated he was present with John Payton, <br />the Project Engineer. <br />Regarding condition number two, Mr. Palmquist stated the plans have been submitted to <br />the Rice Creek Watershed District and he hoped to have approval from them by July 25, <br />2001. He stated Anoka County has agreed to the igation of wetlands on their <br />property. <br />Regarding condition number six, Mr. Palmquist ., ov ded 'ty Engineer with a packet <br />of the requested information and apologized f• = sub ttal of these items. <br />Regarding condition number 12, Mr. P. 'st sta he was hoping that the County <br />Traffic Engineer will grant approval of the proposed. He indicated without this <br />access alignment the development of ='ve forward. <br />Regarding condition number <br />indicated that it would b <br />points to the Apollo <br />remain. He stated Kohl' <br />proposed handicap stalls. <br />13, quist stated Kohl's Project Engineer had <br />eliminate the eastern and western most access <br />ion, however, the middle four access points must <br />greeable to the landscaping islands adjacent to the <br />Mr. Palmquist stated with regard to the planting beds in front of the Kohl's store, there is <br />a conflict with some of the tree grades. He stated that he would like to work with staff to <br />eliminate the tree grades and add more plantings. <br />Mr. Palmquist stated Kohl's requires a 9 1/2 foot parking stall width. He stated he was in <br />agreement with conditions 4 and 15. He stated the requirements for lighting found in <br />condition number five were acceptable, however, he was concerned about the cost of the <br />additional light fixtures. He stated he would like to work with staff to find a similar but <br />less costly fixture. <br />Mr. Grochala indicated the original suggestion was that the development use the same <br />light fixture chosen for the Town Center. He indicated the Town Center light fixtures <br />have not yet been installed and staff was willing to work with the developer to find a <br />similar less costly fixture that could be used in the Town Center as well. <br />
The URL can be used to link to this page
Your browser does not support the video tag.