My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/08/2001 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2001
>
08/08/2001 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2014 3:47:55 PM
Creation date
6/3/2014 12:20:22 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
08/08/2001
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />draft letter via e -mail. The total cost estimate is at $9154. This is a draft estimate and is <br />subject to change. <br />The largest single line item is the pool itself. Mr. Ramsay states that disassembling the <br />pool voids the lifetime warranty, so a complete new pool is necessary if it is to be moved. <br />Staff will need to confirm the cost estimates. We also would like to know if anything can <br />be re -used without affecting the warranty. For example, we don't know if the pump, <br />filter, and other items may be unaffected structurally by disassembly or if these items are <br />included in the cost estimate. In addition to the pool itself, there are other costs such as <br />earthmoving and landscaping that will have to be considered and compared. <br />Note that the last paragraph in the draft letter from Mr. Ramsay refers to an "attached list <br />of residents." The Ramsays plan to submit a petition with neighbor signatures supporting <br />a six -foot fence. We have not yet received the petition as of August 3. <br />RECOMMENDATION <br />We received the draft letter with costs via e -mail at 2:20 pm on Thursday, August 2. No <br />analysis has been conducted to include in this report, which must be sent to P & Z <br />members August 3. Staff will discuss the costs further at the August 8 meeting. The <br />intent is to have a recommendation for the August 8 meeting. <br />
The URL can be used to link to this page
Your browser does not support the video tag.