My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/08/2001 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2001
>
08/08/2001 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2014 3:47:55 PM
Creation date
6/3/2014 12:20:22 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
08/08/2001
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Planning & Zoning Board <br />June 13, 2001 <br />Page 30 <br />Mr. Corson made a MOTION to close the Public hearing closed at 11:00 p.m. and was supported <br />by Mr. Rafferty. Motion carried 5 -0. <br />K. North American Composites, Amend Condition of Approval for Site Plan <br />Staff presented the application by explaining the City Council approved a minor subdivision and <br />site and building plan for North American Composites on November 13, 2000. One of the <br />conditions of approval was: <br />4. The precise concrete panels will be Fabcon Wide Rack 3/8" grooves at 3" O.C. <br />with smooth concrete cattails design, or similar design. Decorative concrete <br />block on the office portion of the building shall be either smooth burnished <br />concrete block or rock -face block. <br />Staff stated this originated in a request by the Planning & Zoning Boar <br />elevation along the freeway. Because this was a very visible locatio <br />additional attention to aesthetics. In response, the applicant then <br />elevation that included a custom "cattail" pattern in the concre <br />not see the new pattern, the revision was included in the pr <br />was specified in the condition of approval listed above. <br />'sit the building <br />asked for some <br />ised south <br />gh the P & Z did <br />e City Council and <br />Staff indicated North American Compsites had asked tha <br />the cost of the custom design. Instead, they had <br />stripe across the top of the precast concrete pan <br />original submittal. In addition, the design <br />office portion exterior would still be de <br />metal roof on both portions of the buil <br />proposed design had a flat roof fo <br />but the east elevation incorporat <br />ndition be deleted because of <br />a design that included a four -foot blue <br />els had a raked finish, just like the <br />th -ildin had been reviewed somewhat. The <br />e block. However, the standing seam <br />ged in the new design. Instead, the new <br />e portion. The office portion also had a flat roof, <br />Cade. <br />Staff stated the footprint o de "_ increased the footprint by about 500 sf, about a 2% <br />change. Staff considered this atively minor change. <br />Staff indicated because ca design was a condition of approval, it would require action by <br />the City Council to chan _`._ it. Staff discussed the request with the City Council at the June 6 <br />worksession. Council s cted staff to bring the request to the P & Z for a recommendation. It <br />would then to go the City Council at its June 25 meeting. <br />Staff recommended approving the new building design and revising the condition of approval to <br />delete the sentence regarding the cattail design. Condition number four would thus read: <br />4. The warehouse portion will be precast concrete panels and the office portion of <br />the building shall be decorative concrete rock -face block as indicated on the <br />exterior elevations by Stiglich Construction, Inc., dated 5/1/01. <br />• Chair Schaps invited applicant to make comment. <br />Ivan Levy, presented a history of the project and thanked the Board and staff for all of their <br />efforts. <br />
The URL can be used to link to this page
Your browser does not support the video tag.