Laserfiche WebLink
JAN -04 -2002 12:58 <br />Mr. Jeff Smyser <br />City of Lino Lakes <br />• January 4, 2002 <br />Page 3 <br />651 292 0083 P.04/04 <br />spacing is typical. During any bridge construction, the existing houses must be protected <br />from excess vibration. <br />The most efficient and ecologically responsive design cannot be determined based on the <br />information provided. From a safety standpoint, no escape route has been provided to the <br />pedestrians on the bridge aside from going over the side into the water. <br />12. No preliminary lift station design information has been submitted. <br />13. C4-1 has incomplete and inconsistent profile information. <br />If you have any questions, please call me at 651 - 982 -2430. <br />Since y¢1 <br />M. Pc&vell, RE. <br />Cyfy Engir{eer <br />C: M. Grochala, Director of Community Development <br />J. Smyser, City Planner <br />W. Hawkins, City Attorney, 2140 Fourth Avenue North, Anoka, MN 55303 <br />TOTAL P.04 <br />