My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03/13/2002 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2002
>
03/13/2002 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2014 3:14:01 PM
Creation date
6/5/2014 9:41:28 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
03/13/2002
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />Planning & Zoning Board <br />January 9, 2002 <br />Page 3 <br />accessory square footage of 2,180 sq. ft. This is 160 sq. ft. more than is allowed under <br />City Ordinance. <br />Staff advised that construction of the proposed picnic shelter would violate the City's <br />Zoning Ordinance in terms of both number and size of accessory structures. Removing <br />the 8' X 10' tool shed already on site and decreasing the size of the proposed picnic <br />shelter by 160 -sq. ft. are options to resolving this zoning issue. It should be noted that the <br />City's Zoning Ordinance reaches a cap, or threshold level, of 2,020 sq. ft. for accessory <br />buildings in any size lot of one and one - quarter acre or greater in an R -3 zone. That is, <br />unlike zoning for Rural and PSP zones, R -3 zones do not allow more accessory square <br />footage as lot size increases. As a result, even though the proposed site is approximately <br />5.2 acres in size, the proposed picnic shelter would not be allowed under City Zoning <br />Ordinance, and would thus require approval of a Variance for construction. <br />Staff reviewed that in 1997, the Gethsemane United Meth <br />Rezoning, Minor Subdivision, and Comprehensive Plan <br />a parsonage. The above requests were all approved a <br />that "the subdivision includes the formal dedicatio <br />way, with the understanding that Parcels B and <br />future construction of the street ". In other w <br />that street right -of -way be granted for the. subdi <br />od'a. hurch to underwent a <br />order to construct <br />, subject to the condition <br />tageoach Trail right -of- <br />will be financially responsible for the <br />vision was granted on condition <br />Staff advised that on inspection of the r <br />that such right -of -way was never <br />the opportunity presented by t <br />Amendment to correct this <br />eparation of this report, it was found <br />. Staff would suggest that the City use <br />est for a Conditional Use Permit <br />Staff stated it cannot : i a approval of the Conditional Use Permit Amendment as <br />presented, since it vi . tee 'the Zoning Ordinance. However, if granted, staff would <br />recommend any appro of this Conditional Use Permit Amendment include the <br />following con <br />1. A building; permit must be obtained for construction of the proposed picnic <br />shelter. <br />2. Issuance of the building permit will not be granted until the former approved <br />dedication of the Stage Coach Trail right -of -way is officially recorded. Such <br />dedication is with the understanding that Parcels B and C will be financially <br />responsible for the future construction of the street, as approved by City Council <br />on May 27, 1997. <br />Ms. Gretz indicated that Pastor Gilbertson was in attendance this evening representing <br />Gethsemane United Methodist Church. <br />Chair Schaps asked if the alternatives of removing the tool shed and decreasing the size <br />of the proposed picnic shelter had been discussed with the applicant. <br />
The URL can be used to link to this page
Your browser does not support the video tag.