My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03/13/2002 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2002
>
03/13/2002 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2014 3:14:01 PM
Creation date
6/5/2014 9:41:28 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
03/13/2002
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />Planning & Zoning Board <br />January 9, 2002 <br />Page 4 <br />Ms. Gretz indicated Pastor Gilbertson was aware of the City's zoning ordinance but the <br />proposed alternatives had not been discussed with him. She indicated that staff has <br />discussed with the applicant the possibility of eliminating the tool shed. <br />Chair Schaps questioned whether attaching the tool shed to the garage would meet the <br />ordinance requirements. Ms. Gretz felt that incorporating the two structures into one <br />would be a possible solution. <br />Mr. Rafferty requested confirmation that the two detached structures currently on site <br />consisted of the tool shed and the garage. Ms. Gretz stated this was correct. <br />Mr. Rafferty requested confirmation that if the tool shed were eliminated approximately <br />80 square feet of total existing structure would be eliminated. Ms. Gretz agreed. <br />Mr. Rafferty believed that this may be a possible solution if <br />was also reduced. He was concerned, however, with the <br />structures and how the proposed picnic shelter would <br />currently a sign to the rear of the garage facing the <br />that a new structure would enhance the site. <br />Chair Schaps invited the applicant like to <br />Pastor Chad Gilbertson, representing G <br />himself and Steve Matson, Chai <br />Board of Trustees. <br />Chair Schaps asked Past <br />the construction of t <br />e picnic shelter <br />he existing <br />that there is <br />He wished to ensure <br />United Methodist Church, introduced <br />thsemane United Methodist Church <br />son s opinion on the proposed resolutions to allow <br />elter. <br />Pastor Gilbertson state + ,Poe elimination of the tool shed would be a viable option. He <br />noted the picnic picniPshe,lter a ` oposed would still exceed the ordinance square- footage <br />requirement by 0 He questioned whether the size of a structure such as a picnic <br />shelter would be easured according to the size of the slab. Chair Schaps believed this <br />was usually the c e. <br />Mr. Smyser noted the plans submitted to the City showed the proposed size of the picnic <br />shelter, which was the size used by staff in making its report. <br />Pastor Gilbertson suggested that the length and width of the picnic shelter could be <br />reduced by one -foot to address the total square footage limitation concern. He noted that <br />an option had been discussed of combining the tool shed with the garage. <br />Mr. Matson suggested that a new tool shed be constructed attached to the garage. <br />Mr. Rafferty stated that any new addition to the site should accent the parsonage building, <br />not the garage. He personally felt the garage is a weak spot on the lot. He questioned <br />whether the trusses currently on site were left over from the construction of the garage. <br />
The URL can be used to link to this page
Your browser does not support the video tag.