My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07/10/2002 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2002
>
07/10/2002 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2014 4:11:08 PM
Creation date
6/6/2014 9:32:41 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
07/10/2002
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />Spirit Hills. <br />Page 5 of 8 <br />has been provided for under the canopy. Lighting under the canopy shall be designed with <br />completely recessed lighting and no lighting on the canopy sides. <br />Grading and Drainage: The submitted erosion and grading plan is subject to review and <br />approval by the City Engineer. The City Engineer's comments, dated July 3, 2002, are attached. <br />Utilities: The submitted utility plan is subject to review and approval by the City Engineer. <br />The City Engineer's comments, dated July 3, 2002, are attached. <br />Easements: All standard easements are to be dedicated with the final plat. There is an existing <br />drainage and utility easement to be vacated that was previously platted with the Spirit Hills <br />subdivision; this shall be completed prior to issuance of a building permit. <br />Park Dedication: Park dedication has not previously been satisfied on this parcel. As a <br />result, the proposed final plat will be subject to park dedication requirements. For commercial <br />development, a park dedication requirement of $2,175.00 per acre is required. The plat includes <br />3.75 acres which requires a park dedication of $8,156.25 to be paid prior to recording the final <br />plat. <br />Proposed Use: The development is intended to be used for Retail and Service uses <br />consistent with the GB, General Business District. Three uses proposed on the plan include a <br />Day Care Facility, Motor Fuel Station (Convenience Store) and Bank with Drive -Thru, which <br />require a Conditional Use Permit. Approval of these uses are included as part of the PDO <br />approval but are identified here for clarity in what will be permitted. <br />The Planning and Zoning Board shall recommend a conditional use permit and the Council shall <br />order the issuance of such permit only if it finds that such use at the proposed location: <br />1. Will not be detrimental to or endanger the public health, safety, comfort, convenience or <br />general welfare of the neighborhood or the City. <br />Comment: Bank drive -thru, child day care and service station uses currently exist within <br />the City of Lino Lakes. None of the uses should be detrimental or endanger the public. <br />2. Will be harmonious with the general and applicable specific plans and policies of the <br />comprehensive plan of the City and this ordinance. <br />Comment: The comprehensive plan guides for commercial use of this site. Once rezoned <br />from R -1 to General Business the site would match the comprehensive plan. <br />3. Will be designed, constructed, operated, and maintained so as to be harmonious and <br />appropriate in appearance with the existing and/or intended character of the general <br />vicinity and will not change the essential character of that area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.