My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/14/2002 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2002
>
08/14/2002 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2014 3:54:26 PM
Creation date
6/6/2014 11:23:38 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
08/14/2002
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />AGENDA ITEM 5D <br />STAFF ORIGINATOR: Bob Kirmis (NAC) <br />P AND Z MEETING DATE: August 14, 2002 <br />TOPIC: JADT Addition - Preliminary Plat, Site & Building <br />Plan Review and CUP for Accessory Drive - through <br />BACKGROUND <br />JADT Development Group, LLC. has requested preliminary plat approval to allow a four lot, <br />commercial subdivision (JADT Addition) on property located east of County Road 23 between <br />Apollo Drive and I -35W. <br />The subject 7.0 acre development overlays Outlot B of the Lino Lakes Commercial Development <br />(PDO) which was approved last year. <br />In conjunction with the preliminary plat request, the applicant is also requesting site and building <br />plan approval to allow the construction of a 14,172 square foot retail strip center upon proposed <br />Lot 4 of the subdivision and a conditional use permit to allow a drive -thru facility. <br />The subject property is zoned SC, Shopping Center with a PDO, Planned Development Overlay <br />(to allow various design flexibilities). <br />This review is based on the following plan submittals: <br />Preliminary Plat dated 7/15/02 <br />Preliminary Site Plan dated 7/15/02 <br />Preliminary Utility Plan dated 7/154/02 <br />Preliminary Grading Plan dated 7/15/02 <br />Site Plan dated 7/15/02 <br />Floor Plan dated 7/15/02 <br />Building Elevations dated 7/15/02 <br />Planting Plan dated 7/15/02 <br />Landscape Details dated 7/15/02 <br />Lighting Plan dated 7/15/02 <br />City Engineer Comments dated 8/9/02 <br />Environmental Board Comments dated 8/6/02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.