My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/14/2002 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2002
>
08/14/2002 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2014 3:54:26 PM
Creation date
6/6/2014 11:23:38 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
08/14/2002
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Memorandum <br />Dated August 9, 2002 <br />Page 2 <br />Street Standards: <br />Layout allows adequate traffic movement. <br />The most easterly street connection is onto private property and would require an <br />access agreement. <br />Storm Sewer: <br />- The storm sewer and drainage package complete submittal was not received until <br />August 5th and is currently being reviewed. <br />Grading Standards: <br />General design meets the requirements by the City of Lino Lakes. Further review <br />will be required upon addressing issues as outlined in the storm sewer review. <br />Documentation of material entering and leaving the site will be necessary prior to <br />approval of the plans. Minimum ditch grades of 2% will be required. <br />Recommendation: <br />• The design generally meets City requirements. Upon completion of the above issues, <br />final approval can be given for the proposed JADT Addition. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.