Laserfiche WebLink
Bruggeman Properties <br />Page 7 of 13 <br />While it is recognized that the motor fuel station, fast food restaurant and office building/daycare <br />facility are conceptual in nature and will be subject to a future site and building plan review <br />process, their inclusion in the submission is considered positive by allowing a comprehensive <br />review of the proposal and an overall setback evaluation to take place. As shown above, all <br />applicable GB District lot area and setback requirements have been satisfied. <br />Architecture/Building Materials. At this time, building details have only been provided for the <br />retail center. The building's architecture is characterized by varied gable roof forms and column <br />features (wood and stone). <br />As shown on the submitted building elevations, the building is to be finished in a combination of <br />cement- based lap siding (painted), stone and faux cedar shakes (in gabled roof areas). The <br />building's roof is proposed to be finished with asphalt shingles. <br />The proposed building materials are consistent with the material requirements of the Ordinance. <br />As a condition of site and building plan approval however, building colors should be specified <br />and approved by the City. <br />Parking. The standards for calculating the off - street parking requirements for shopping centers <br />are outlined in Section 3, Subdivision 5 of the City Code. For the purposes of calculating <br />parking spaces, the ordinance requirement is to use 90% of the gross building area. <br />Use <br />Gross Area <br />90% of <br />Gross Area <br />Ratio <br />Required <br />Spaces <br />Shopping <br />Center <br />12,160 s.f. <br />10,944 s.f. <br />5 1/2 spaces per each <br />1,000 square feet of <br />gross leasable area <br />(exclusive of common <br />areas) <br />60 <br />As shown above, a total of 60 off - street parking stalls are required for the proposed retail <br />building. The applicant's plan calls for 91 stalls within Lot 1 and exceeds the minimum off - <br />street parking supply requirement. To be noted however, is that such parking supply is also <br />intended to accommodate the future parking supply for the motor fuel station. Anticipating a <br />parking supply requirement of approximately 8 to 10 stalls for the motor fuel station, the <br />proposed Lot 1 parking supply is considered adequate. <br />As shown on the site plan, 7 off - street parking stalls are located on the east side of the building. <br />Considering that such stalls will not be visible to the general public, and are located proximate to <br />the building's drive- through lane, it is suggested that such stalls be reserved for employee <br />parking. <br />