My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03/12/2003 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2003
>
03/12/2003 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2014 4:20:02 PM
Creation date
6/11/2014 8:32:39 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
03/12/2003
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Planning & Zoning Board <br />March 12, 2003 <br />DQ Grill & Chill Site Plan Review & CUP <br />Signage is governed by the City's sign ordinance and permits are required for all signs. <br />All signs will be reviewed with the sign permit applications. <br />The Lino Lakes Market Place PDO, Section 2.C.1.d, states that wall signage for single <br />tenant buildings within the Lino Lakes Market Place complex "shall be designed in <br />accordance with the sign requirements of the Shopping Center (SC) Zoning District as <br />specified in Ordinance No. 12 -97" (Lino Lakes Sign Ordinance). <br />According to the Lino Lakes Sign Ordinance, wall signage in the SC District is limited to <br />one wall sign, which is limited in size to 100 sq.ft. or 20% of the building face, <br />whichever is less. <br />The Market Place PDO, provides for one monument sign on the site in accordance with <br />the approved design standards. <br />Trash <br />Trash equipment will be confined to a fully enclosed structure, which will be constructed <br />of brick to match the principle building and located at the southeast corner of the site. <br />Utilities <br />A utility plan has been submitted for review by the City Engineer. Water and Sanitary <br />sewer service were provided to service the site as part of the Market Place development. <br />As a condition of plan approval, the utility related modifications and comments, as set <br />forth in the City Engineer's memo, should to be incorporated into the final plans. <br />Stormwater management <br />A grading and drainage plan has been submitted for review by the City Engineer. As a <br />condition of plan approval, the grading and drainage related modifications and comments <br />as set forth in the City Engineer's memo should to be incorporated into the plans. The <br />plan is not subject to review and approval from the Rice Creek Watershed District. <br />ENVIRONMENTAL BOARD ACTION <br />The Environmental Board reviewed the project on February 26, 2003 and recommended <br />approval. Their comments are attached and have been incorporated into this report were <br />applicable. <br />RECOMMENDATION <br />The proposed Site Plan is consistent with the City's Zoning Ordinance and the Lino <br />Lakes Market Place PDO. Staff recommends approval of the proposed DQ Grill & Chill <br />Site Plan Review and CUP, with the following conditions: <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.