Laserfiche WebLink
• <br />• <br />The target for phasing plans is 50 units per phase. With a project of 56 units, total, it is <br />problematic to break it up. It may be possible to divide the project into two phases, though the <br />economics of this may not allow it. <br />Preliminary Plat/Development Stage Plan <br />There are three parts of the PUD process. The first part, the general concept plan, is the <br />voluntary concept plan review. The second part is the development stage plan, which <br />corresponds to the preliminary plat process. The third part, the final plan, corresponds to the <br />final plat process. <br />The Ravens Hollow project is a PUD rezoning. With a PUD, the plat serves to establish some <br />specific elements that become zoning standards. For example if a plat in a PUD includes <br />reduced setbacks or lot dimensions, these things become the setbacks or dimensions in that plat. <br />As noted in the zoning ordinance, such flexibility is intended to encourage such things as: <br />1. A development pattern in harmony with the objectives of the Comprehensive Plan. <br />2. Innovations in development that address growing demands for all styles of economic <br />expansion, greater variety in type, design, architectural standards, and siting of structures <br />through the conservation and more efficient use of land in such developments. <br />3. The preservation and enhancement of desirable site characteristics such as existing <br />vegetation, natural topography and geologic features and the prevention of soil erosion. <br />4. A creative use of land and related physical development which allows a phased and <br />orderly transition of varying land uses in close proximity to each other. <br />5. An efficient use of land resulting in smaller networks of utilities and streets thereby <br />lowering development costs and public investments. <br />6. Promotion of a desirable and creative environment that might be prevented through the <br />strict application of City zoning and subdivision regulations. <br />The primary purpose of using a PUD for Ravens Hollow is to allow the project to comply with <br />the comprehensive plan ( #1). As noted above, the land use category boundaries don't follow the <br />project boundaries, so the densities have been averaged across the entire plat. In order to do so, <br />the plat involves incorporating different housing styles in a creative design ( #2, #4, #6). Design <br />elements that deviate from strict zoning provisions related to setbacks, heights, lot area and <br />dimensions, etc., should be examined in light of the intentions of a PUD. <br />Unit types: The project includes two different housing types. There are 26 standard single <br />family lots and 30 single family detached townhome lots. <br />The location of the varied housing types creates a transition in land use intensities. The standard <br />lots in the northern part of the site coincide with the existing Fox Trace neighborhood. In fact, <br />the Ravens Hollow lots are larger. The single family, zero lot line townhomes in the southern <br />area consistent with the medium density required by the comprehensive plan and provide a <br />