Laserfiche WebLink
• <br />17. A 2.0 -foot minimum cover over all storm sewer i e is required. <br />PP q <br />Ravens Hollow Review Page 4 June 30, 2003 <br />City of Lino Lakes, Minnesota <br />13. All drainage from this site falls within the drainage area of Baldwin Lake in accordance with the <br />City's Surface Water Management Plan. The majority of the site's drainage is proposed to flow to the <br />southeast part of the site, and into a wetland that extends into the property to the south. The 100 -year <br />elevation of the wetland, as well as the 100 -year elevations proposed for the development site <br />ponding, must clearly be shown to assure that water does not exceed or overtop Ware Road. All <br />emergency overflow locations and elevations must also be clearly shown to assure that proposed <br />housing elevations are safely above projected flood levels. <br />14. The proposed pond along Ware Road (at the rear of Lots 3, 4, and 5) appears to discharge to a <br />Wetland along Ware Road. The wetland outlet and emergency overflows are not defined or identified <br />on the plan. <br />15. It is assumed that the legend and grading notes on Sheet 2 correspond to Sheet 1. As part of standard <br />practice, such notes are typically provided on the same sheet. It is suggested the notes either be <br />shown on Sheet 1, or referenced accordingly. <br />16. Sheet 1 is very cluttered with numbers and details over much of the plan (too close to each other or <br />on top of each other), thus making it difficult to fully review. The plan must be cleaned up in order to <br />be acceptable. <br />18. The following notes must be added or revised as follows: <br />• A note shall be added, stating that any fill material, topsoil, or soils imported to the site must <br />be approved by the City Engineer. The source of the material must also be provided to the <br />City Engineer. <br />• An additional note must be added stating that all permit requirements of the RCWD must be <br />adhered to. <br />• All grading shall be confined to the property. No additional runoff from the site shall enter <br />upon neighboring properties. If grading requires any work into the adjoining property, the <br />Contractor shall be responsible for attaining authorization as needed. <br />• The proposed backyard draining of many of the house units, particularly along the north, <br />south, and west sides of the property must be addressed further to assure that additional <br />drainage is not being added to neighboring properties. <br />Utility Plan <br />• 1. The plan proposes connecting an 8 -inch water pipe to an existing 12 -inch line at Linda Lane. Further <br />review by the City should be conducted to verify that further extension of the 12 -inch size into or <br />through the property is not needed. <br />