Laserfiche WebLink
TKDA <br />ENGINEERS • ARCHITECTS • PLANNERS <br />MEMORANDUM <br />To: <br />Copies To: <br />From: <br />Date: <br />James Studenski, City Engineer <br />Scott A. Brink, P.E. <br />August 7, 2003 <br />1500 Piper Jaffray Plaza <br />444 Cedar Street <br />Saint Paul, MN 55101 -2140 <br />(651) 292-4400 <br />(651) 292 -0083 Fax <br />www.tkda.com <br />Reference: Marshan Lake Industrial Park/ <br />Comm. No. <br />Routing: <br />Panattoni Development <br />City of Lino Lakes, Minnesota <br />12701 -002 <br />The Marshan Lake Industrial Park/Panattoni Development as presented proposes to construct a 265,000 <br />square foot office /warehouse facility on over 17 acres of property, located between Lake Drive and I -35 W, <br />just south and west of the City Hall complex. The building itself is located on 13.5 acres. <br />The proposed Panatonni site property is part of a larger area referred to as the Marshan Lake Industrial Park. <br />For purposes of simplification, this review shall be identified and referred to as the Panatonni Development. <br />The following plans and documentation have been submitted to the City of Lino Lakes, and these <br />preliminary review comments are presented based on that submittal: <br />1. Preliminary Plat, Marsh Lake Industrial Park, prepared by Glenn Rehbein Companies and dated July <br />14, 2003. <br />2. Certificate of Survey, Marsh Lake Industrial Park, prepared by Glenn Rehbein Companies and dated <br />July 14, 2003. <br />3. Site Plan, Grading Drainage and Erosion Control Plan, Utility Plan, Details Plan, Inventory Plan, and <br />Tree Preservation Plan, (Sheets 1 through 7), prepared by Glenn Rehbein Companies and dated July <br />11, 2003. Revised Grading Plan dated July 24, 2003 also received. <br />4. Architectural Drawings , prepared by Heitman Architects, Inc., and dated July 11, 2003, Sheets P -1, <br />A2.0, A2.1, and A5.0. <br />5. Landscape Plans, prepared by Landscape Architecture Master Planning Environmental Design, dated <br />July 14, 2003. <br />6. Application for General Storm Water Permit for Construction (MPCA) and Rice Creek Watershed <br />District Infiltration Worksheet <br />7. Drainage Calculations prepared by Glenn Rehbein Companies and dated July 27, 2003, and Drainage <br />Area Maps received July 25, 2003, prepared by Glenn Rehbein Companies. <br />8. Soil Boring Map of Marshan Lake Industrial Park dated July 28, 2003, prepared by Glenn Rehbein <br />Companies <br />9. Report of Geotechnical Exploration and Review, prepared by American Engineering Testing, Inc. <br />and dated July 11, 2003. <br />10. Wetland Delineation Report, prepared by Polaris group and dated May 2003. <br />An Employee Owned Company Promoting Affirmative Action and Equal Opportunity <br />