Laserfiche WebLink
Eagle Brook Church <br />• page 2 <br />• <br />a. The new lot that has a minimum area of one acre contains the existing habitable <br />home, and <br />b. The balance of the property is ten (10) acres or more, and <br />c. The new lot that has a minimum area of one acre contains one acre of contiguous <br />buildable land, not including road right of way, electrical transmission line <br />easements or pipeline easements, and <br />d. Both the one - acre - minimum lot and lots made from the remaining land must meet <br />all minimum lot requirements and provide for meeting setback and other structure <br />requirements, and <br />e. It can be demonstrated that all unsewered lots can accommodate the proposed <br />principal structure, onsite well if the public water system is not available, and an <br />onsite wastewater treatment system including both a primary and secondary drain <br />field area in accordance with MN Stat. 7080 and other applicable requirements. <br />Section 5, Subd. 1.B.2. states that the minimum lot width in the Rural zoning district is 330 feet <br />"except as provided for in Section 3, Subd. 3.B.2., which shall require a minimum lot width of <br />two hundred (200) feet. The proposed house lot is 200 wide along the road. <br />The house has existed for much longer than 1992. The proposed lot for the existing house is <br />6.16 gross acres. The remainder of the property is over 80 acres. An easement for the relocated <br />county ditch along the entire southern property line (1060') is 100' wide, totaling 2.4 acres. This <br />leaves approximately 3.7 acres of contiguous upland. There may be a powerline easement along <br />the road frontage that may include less than one half acre. The lot lines provide for all required <br />setbacks. The proposed house lot meets requirements a through d, listed above. <br />A revised preliminary plat received December 3rd shows the locations of the existing septic <br />system drainfield and an area for a secondary drainfield. They are barely within the proposed <br />property lines. MPCA rules (MN Rule 7080) state there must be a 10' setback from property <br />lines. Even though a new system was installed in 1993, we still require a site for a secondary <br />system in the event the first one fails. We also will need information to ensure that the second <br />drainfield can be accommodated on the lot. This requires a soils test by a qualified septic system <br />designer. <br />The existing well also must be located to ensure it is within the property lines and properly <br />separated from the secondary drainfield location. <br />Access: The site plan discussed previously showed the southern driveway for the church <br />50' from the southern property line of the larger 90 -acre parcel. The preliminary plat shows the <br />house driveway in its current location, running along the southern edge. The proposed church <br />driveway has been moved north, about 200' from the house driveway. It will be 20' from the <br />proposed lot line. <br />The church driveway would be nearly opposite an existing residential driveway on the east side <br />of 20th Ave. This may seem undesirable for that resident. However, it offers several advantages. <br />It eliminates the creation of an additional conflict point along the road: the conflict point already <br />