My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12/10/2003 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2003
>
12/10/2003 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2014 2:39:00 PM
Creation date
6/12/2014 1:07:17 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
12/10/2003
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TKDA 1500 Piper y Plaza <br />444 Cedar Street <br />Saint Paul, MN 55101 -2140 <br />ENGINEERS • ARCHITECTS • PLANNERS <br />• (651) 292 -4400 <br />(651) 292 -0083 Fax <br />MEMORANDUM www.tkda.com <br />To: James Studenski, City Engineer Reference: Eagle Brook Church <br />Copies To: <br />From: Scott A. Brink, P.E. <br />Date: November 5, 2003 <br />City of Lino Lakes, Minnesota <br />Comm. No. 12701 -002 <br />Routing: <br />The City of Lino Lakes has received plans providing for the construction of a church facility on a 91 acre site <br />located east of 20th Avenue North and north of 77th Street East. The following document copies have been <br />provided for review: <br />1. Land Use Application dated October 13, 2003. <br />2. Full size and 11X17 -size Application for Conditional Use permit plan set (14 sheets) dated October <br />13, 2003. <br />3. Lighting Details dated October 13, 2003. <br />4. Environmental Assessment Worksheet (EAW) dated October 21, 2002. <br />5. Review memorandum from Jeff Smyser of the City of Lino Lakes to James Studenski of the City of <br />Lino Lakes dated October 29, 2003. <br />6. City of Lino Lakes Resolution No. 03-44 making a negative declaration on the need for an <br />Environmental Impact Statement (EIS), including finding of facts supporting the decision, and City <br />responses to EAW comments. <br />7. City of Lino Lakes Conditional Use Permit Narrative, prepared by SRF Consulting Group, Inc., <br />received by the City of Lino Lakes October 13, 2003. <br />8. Eagle Brook Church Traffic Study conducted by SRF Consulting Group dated September 13, 2002, <br />and review comments to the traffic study by TKDA, dated September 16, 2002. <br />9. Description of Fire Protection System and Electrical Generator System by Ericksen Ellison, and <br />Associates, Inc., dated October 13, 2003. <br />10. Onsite Wastewater Treatment System Final Design Report and Specifications for Eagle Brook <br />Church, dated October 8, 2003. <br />An Employee Owned Company Promoting Affirmative Action and Equal Opportunity <br />
The URL can be used to link to this page
Your browser does not support the video tag.