My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12/10/2003 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2003
>
12/10/2003 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2014 2:39:00 PM
Creation date
6/12/2014 1:07:17 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
12/10/2003
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Eagle Brook Church Review <br />City of Lino Lakes, Minnesota <br />Page 7 November 5, 2003 <br />5. All grading shall be confined to the property. No additional runoff from the site shall enter upon <br />neighboring properties. If grading requires any work into the adjoining property, the Contractor shall <br />be responsible for attaining authorization as needed. The grading and stormwater routing for the <br />County Road 21 ditch system in relation to the property must also be shown. <br />6. Proposed storm sewer outlet and inlet invert elevations, and drainage structure rim elevations must be <br />shown on the Grading Plan at all locations. Pond outlet details for each outlet area are needed, and <br />can be provided on a Detail Sheet. <br />7. Easements shall be provided around all wetland and stormwater detention areas. <br />Utility Plan <br />The Utility Plan submitted at this time provides a general overall design for the utility system (water, <br />sanitary sewer, and storm sewer). Much of the detailed information required for construction Plans has not <br />yet been provided. However, the following general comments can be made regarding the Utility Plan at this <br />time: <br />1. Profile sheets, construction notes, service locations, and other pertinent information typical of utility <br />construction Plans shall be provided accordingly. All utility system materials and installation <br />methods shall follow City of Lino Lakes engineering standards, and the requirements of the Standard <br />Utilities Specifications of the City Engineers Association of Minnesota. These requirements must be <br />specified on all Utility Plan, along with additional construction notes that include the following: a <br />legend, provisions for private utilities, references to City of Lino Lakes requirements for utility <br />notifications and shut - downs, traffic control and safety requirements. <br />2. All utility installations shall be performed in accordance with the recommendations of a geotechnical <br />engineer. It is our understanding that a geotechnical investigation of the site has been conducted. A <br />copy of the geotechnical investigation and report must be provided to the City. <br />3. All trenches (including services) shall be backfilled and compacted and meet 100% maximum <br />Standard Proctor Density in the upper 3 -feet from finished road elevation, and 95% maximum <br />Standard Proctor Density below the upper 3 -feet. <br />4. Water pipe and appurtenances shall meet the requirements of the City of Lino lakes, and as follows: <br />Hydrants - Waterous Pacer WB -67; Valves - Mueller A2370 -20 or equal. DIP pipe shall be Class 52. <br />City standards must be identified 011 the plan or provided on a detail sheet. Well installation shall and <br />the water distribution system shall conform to the requirements of the Minnesota Department of <br />Health and Department of Natural Resources as applicable. <br />5. The Grading and Utility Plans shall include notes providing for erosion and sedimentation control. <br />6. All storm sewer pipes must be RC pipe. Pipe sizes, grades, and structure invert and rim elevations <br />must be provided. <br />
The URL can be used to link to this page
Your browser does not support the video tag.