My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03/10/2004 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2004
>
03/10/2004 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2014 12:05:52 PM
Creation date
6/13/2014 1:42:59 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
03/10/2004
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGENDA ITEM V. A <br />STAFF ORIGINATOR: Jeff Smyser <br />P & Z MEETING DATE: March 10, 2004 <br />TOPIC: Resolution 03 -101: Final Plat, Century Farm North <br />BACKGROUND <br />The preliminary plat for Century Farm North was approved by the City Council on April <br />28, 2003. The approval includes a phasing plan as required by the growth management <br />ordinance. The final plat for phase 1 (56 units) was approved in July. The developer has <br />submitted the final plat for phase 2. <br />The submitted final plat includes individual lots for units in phase two of the approved <br />phasing plan. This includes 65 units: 22 single family detached townhomes, 42 single <br />family lots, and one single family lot for an existing house. This existing home was not <br />expected to remain when the phasing plan was approved. In order to comply with the <br />approved phasing plan, this lot must be counted as a new unit. <br />ANALYSIS <br />Because of the complexity of this project, each phase includes elements not necessarily <br />included in previous phases. The final plat for each phase must be compared against the <br />conditions of approval. <br />The final plat substantially conforms to the approved preliminary plat and phasing plan. <br />A revised title commitment is under review and must be approved by the City Attorney, <br />along with the association declarations, before the final plat is considered by the City <br />Council. The first phase's association document included the authority for the City to <br />enforce the terms of the declarations. The City Attorney recommends including this in <br />the second phase as well. <br />A development contract is being prepared, and will include financial securities. <br />Conditions attached to approval of the preliminary plat (Resolution 03 -60): <br />Condition #4: "The submitted townhome housing types and building elevations be <br />modified to specify finish materials and be subject to City approval. Side walls facing <br />public streets shall include windows or other architectural features to avoid the <br />appearance of a blank wall." <br />
The URL can be used to link to this page
Your browser does not support the video tag.