My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/14/2004 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2004
>
04/14/2004 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2014 11:53:59 AM
Creation date
6/13/2014 2:26:52 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
04/14/2004
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />Oakwood View <br />page 3 <br />The comprehensive plan currently guides the site for Public /Semi- Public (PSP) land use. This <br />was done because of the existence of the church. The PSP category is not specifically for <br />churches: the plan does not have a specific category for churches, nor are churches discussed in <br />the plan. The zoning ordinance allow churches by conditional use peimit in all residential zones. <br />Because of the residential uses proposed for the site, the Low Density Sewered Residential <br />classification is appropriate. This would allow for all uses proposed in the application. <br />The plan shows single family detached lots in the northern area at a density of 2.37 units /acres. <br />This falls within the 3 -6 u/a range allowed by the Low Density Sewered Residential land use <br />category. The group residence duplex also falls within this range. <br />The amendment to the comprehensive plan must be submitted to the Metropolitan Council for <br />review. Because of the small size of the project, we expect the Met Council review to be brief. <br />Growth Management: <br />MUSA Reserve: The comprehensive plan and the growth management policy establish a <br />specific number of MUSA reserve acres to be allocated for residential growth for stage one <br />(prior to year 2010). The site is within the existing MUSA, so no MUSA reserve is required. <br />Growth Management, Units /Year: The comprehensive plan and the growth management <br />policy establish a specific number of dwelling units of residential growth for stage one (prior to <br />year 2010). The goal is 147 per year. The City Council has the flexibility to exceed the limit by <br />20% (29 units) in a year without amending the comprehensive plan. The table at the end of this <br />report shows the status of the staging plans for final platting new residential units. <br />Approvals for year 2004 have exceeded the goal by 18.4 %. An additional two units will raise <br />that to 19.7 %. This is within the allowable discretionary range. At the discretion of the City <br />Council, the duplex could be final platted in 2004. <br />However, ten more lots would go beyond the 20% limit. Therefore, final platting of the ten <br />single family lots on the north side of the property will have to wait until 2005. In other words, <br />if this project is to proceed, it must be phased over two years. <br />Rezoning <br />The PUD zoning is intended for the southern portion of the site. The northern portion is to retain <br />its current R -1X zoning. As stated in the zoning ordinance, the Planning and Zoning Board <br />shall consider possible adverse effects of the proposed zoning amendment. Its judgement shall <br />be based upon, but not limited to, the following factors: <br />1. The proposed action has been considered in relation to the specific policies and provisions of <br />and has been found to be consistent with the official City Comprehensive Plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.