• <br />• <br />Oakwood View <br />page 9 <br />4. The conditional use permit approved in 1996 to allow the construction of the church is still in <br />effect. Future expansion of the church shall be as approved with the conditional use permit. <br />5. The duplex residential facility shall be constructed as depicted on the plans included as part <br />of this approval. <br />6. The relocation of sanitary sewer and water services may occur with the 2004, phase one final <br />plat because these utilities already existed. However, the construction of the Oakwood Lane <br />street extension shall not occur until final plat approval of the single family lots in phase two, <br />in 2005. All lots and units shall connect to city sanitary sewer and water. <br />7. Park dedication of $1,665 per unit shall be paid. Park dedication for the group residence, two <br />units, shall be paid when that lot is final platted. Park dedication for the ten single family lots <br />shall be paid with that final plat. <br />8. The new plat must obtain approval by the Rice Creek Watershed District prior to final plat <br />approval by the City Council. <br />9. Drainage and utility easements around all wetlands must be large enough to include at a <br />minimum a ten (10) foot buffer extending outward from the delineated wetland boundary. <br />10. The applicant must submit geotechnical information on existing groundwater levels and soils <br />in adequate time for review prior to City Council consideration of the application. <br />11. Issues discussed in the City Engineer review must be addressed to his satisfaction. <br />12. The City seeding mix must be used for ponds and wetland areas. This must be noted on the <br />plans. <br />13. The property owner must obtain approval from the City Council to vacate the existing <br />ponding and flowage easements. <br />14. Site plan information for the group residence duplex shall be provided prior to issuance of a <br />building permit. This shall include architectural elevations, floor plan, landscaping, and site <br />lighting. Any lighting in the parking area must City requirements. <br />15. There must be a shared driveway easement to allow the new lot to use the existing driveway <br />on Ash St. This easement must be recorded with the final plat. <br />