Laserfiche WebLink
• <br />Fox Den. Acres <br />The Environmental' Board • recommended that this plat be denied under the <br />current zoning, that this would be an excellent property to develop with a <br />greenway corridor. (If approved than other considerations of Environmental Board <br />and Staff should be looked at). : <br />The following recommendations were made:; <br />Recommend this development be considered as. a PUD and /or Conservation <br />Development that would allow for variability in lot sizes and street widths. <br />• :. Suggest that the developer work with the Saddle Club site, or look at purchasing, <br />the Saddle Club site, for developing together with the Fox Den Acres site, so that <br />the two sites could be planned concurrently. <br />• <br />That the proposed •NURP ponds and - infiltration ponds be evaluated for adequate <br />separation and filtration to the seasonally high water table <br />• That the developer works with staff to identify trees that can be saved in buffer . <br />areas.and designated clear areas.. <br />That the development should .allow for the creation of a greenway corridor from <br />the South West comer to the South East comer, and up along the East side of <br />• •• the property. <br />No soils should be imported or exported without City approval. <br />Soil protection areas should be designated and fenced off. <br />• <br />Rock entrances should have additional stockpile of rock on hand to top dress <br />entrances when initial rock entrance fills up. :... , • <br />. <br />Storm water from roofs and back yards should follow some sort of a designed <br />treatment train before water fiows into existing wetlands. <br />The developer `should be required to use the City native seed mix, in 'NURP. and <br />infiltration . pond restoration-work That , the seeding of these areas be <br />accomplished with the services of an approved contractor that is knowledgeable <br />• in native plant restoration. .That the developer be required to hire such a native <br />plant contractor to manage the restoration areas for a minimum of three years. <br />• <br />• <br />• <br />