Laserfiche WebLink
TKDA <br />• ENGINEERS • ARCHITECTS • PLANNERS <br />MEMORANDUM <br />1500 Piper Jaffrey Plaza <br />444 Cedar Street <br />Saint Paul, MN 55101 -2140 <br />(651) 292-4400 <br />(651) 292 -0083 Fax <br />www.tkda.com <br />To: James Studenski, City Engineer Reference: Marshall Lake Townhomes <br />Copies To: 2nd Addition <br />City of Lino Lakes, Minnesota <br />Comm. No. 12701 -002 <br />From: Scott A. Brink, P.E. Routing: <br />Date: July 9, 2004 <br />Engineering Reviews for this proposed development were previously prepared and presented in <br />memorandums dated December 5, 2003, and June 4, 2004. <br />A revised Utility Plan has since been received by the City of Lino Lakes (received July 2, 2004). This <br />review memorandum as presented herein essentially repeats much of the same information presented in the <br />June 4, 2004 memorandum, along with adjustments as a result of the revised utility plan received. <br />•Comments provided in the June 4, 2004 memorandum were based on information provided in the following <br />documents: <br />1. Cover letters from Hokanson Development dated May 6, 2004 and May 20, 2004. <br />2. Legal Counsel Facsimile dated February 20, 2004. <br />3. Letter regarding the Conditional Use permit dated January 12, 2004. <br />4. Narrative Addendum for Conditional Use Permit dated May 6, 2004. <br />5. Stormwater Pond Calculations dated May 6, 2004. <br />6. Lighting Information dated December 4, 2003. <br />7. Park Board Review dated December 1, 2003. <br />8. Architectural Plan Set Cover page received May 7, 2004. <br />9. Preliminary Plan Set (11 sheets - 11X17 and full size), prepared by Schoell and Madson, dated May 5, <br />2004. <br />10. Full size and 11X17 size Architectural Plans (3 sheets each), for both 2 -unit and 3 -unit buildings. <br />Narrative for Comprehensive Plan Amendment, prepared by Hokanson Development, Inc., and received <br />by the City of Lino Lakes October 28, 2003. <br />11. Soil Borings prepared by Braun Intertec dated June 16, 1995, and Geotechnical Evaluation by Braun <br />dated July 24, 1995. <br />12. Wetland Delineation Report prepared by Lori J. Marco dated April 7, 1994. <br />13. Aerial photo of the site (date ?), received May 20, 2004. <br />The revised utility plan received for this review is Sheet 6 of 11(received by the City of Lino Lakes on July <br />2, 2004), but still dated May 5, 2004. Revisions to the plan have been hand drafted into the plan. It is <br />• expected that a revised utility plan with a new revision date (and signed by the Engineer) will also be <br />received. <br />