Laserfiche WebLink
TKDA <br />ENGINEERS • ARCHITECTS • PLANNERS <br />MEMORANDUM <br />1500 Piper Jaffray Plaza <br />444 Cedar Street <br />Saint Paul, MN 55101 -2140 <br />(651) 292-4400 <br />(651) 292 -0083 Fax <br />www.tkda.com <br />To: James E. Studenski, P.E. Reference: Engineering Review of <br />City of Lino Lakes, Minnesota New Brighton Kingdom Hall <br />Copies To: Jehovah's Witnesses <br />Comm. No. 12976 -002 <br />From: Patrick M. Windler, P.E. Routing: <br />Date: November 4, 2004 <br />The church members of the New Brighton Kingdom Hall Jehovah's Witnesses are proposing to construct a <br />new worship and meeting facility along the southeast side of Lake Drive (Anoka CSAH 23) and to the north <br />of Second Avenue. <br />The following engineering review is based on a submitted three ring binder presented by the <br />Developer's /Owners consulting company's for City of Lino Lakes comment. The following civil engineering <br />documents from the submitted three ring binder were used for the below engineering review comments: <br />1. Boundary and Topography Survey of Lot 6, Auditor's Subdivision No. 151 in Section 19, Township <br />31, Range 22 of Anoka County /Lino Lakes, Minnesota, dated September 15, 2004, by Terrence E. <br />Rothenbucher, L.S., of Pioneer Engineering. <br />2. New Brighton Kingdom Hall, Plan Sheet: Site Plan, Minnesota Regional Building No. 1 with no date <br />or signature (labeled Sheet No. 3 of 6). <br />3. New Brighton Kingdom Hall, Plan Sheet: Erosion Control, Minnesota Regional Building No. 1 with <br />no date or signature (labeled Sheet No. 6 of 6). <br />4. New Brighton Kingdom Hall, Plan Sheet: Grading Plan, Minnesota Regional Building No. 1 with no <br />date or signature (labeled Sheet No. 5 of 6). <br />5. Wastewater Treatment System design (layout only) by Daniel Weaver of Earth Science Testing, <br />dated October 8, 2004. <br />6. Drainage Calculations (21 pages) using HydroCAD stormwater routing and ponding modeling for <br />2 -year, 10 -year, and 100 -year design rainfall events as submitted by Rodney Gordon (no company or <br />credentials listed on documents.) <br />• The above documents are all stamped received at the City of Lino Lakes offices on October 11, 2004. <br />An Employee Owned Company Promoting Affirmative Action and Equal Opportunity <br />