My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01/12/2005 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2005
>
01/12/2005 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2014 1:35:04 PM
Creation date
6/18/2014 11:27:41 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
01/12/2005
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />Kingdom Hall, page 8 <br />9. Revise the landscape plan to depict a row of evergreen hedges on the east side of the parking lot prior to <br />this item being heard by the City Council. <br />10. Parking lot lighting standards and fixtures shall be painted forest green to blend with the natural <br />surroundings. <br />11. An automatic fire sprinkler system shall be designed and approved by the Centennial Fire District prior <br />to this item being heard by the City Council. <br />12. Obtain a permit from Anoka County for work within the Lake Drive right -of -way. <br />13. The church shall connect to the municipal sanitary sewer system within 24 months of the public service <br />becoming available. <br />14. The City has the right to periodically review this conditional use permit for compliance with these <br />conditions and for the protection of the public health, safety, and welfare. <br />ATTACHMENTS <br />• <br />1. Location Map <br />2. Kingdom Hall plan packet: <br />a. Title Sheet received October 26, 2004 <br />b. Site Plan received December 17, 2004 <br />c. Grading Plan received December 17, 2004 <br />d. Erosion Control Plan December 17, 2004 <br />e. Drainage Plan December 17, 2004 <br />f. Exterior Elevations October 26, 2004 <br />g. Landscape Plan October 26, 2004 <br />h. Tree Preservation Plan October 26, 2004 <br />i. Lighting Plan received. October 26, 2004 <br />j. Light Fixture Cut Sheets received October 26, 2004 <br />k. Conservation Easement Document Received November 17, 2004 <br />1. Easement Document Received December 17, 2004 <br />3. Environmental Board memorandum dated November 2, 2004 <br />4. City Engineer memorandum dated January 6, 2005 <br />5. Public Comment received November 15, 2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.