My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01/12/2005 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2005
>
01/12/2005 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2014 1:35:04 PM
Creation date
6/18/2014 11:27:41 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
01/12/2005
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TKDA <br />ENGINEERS • ARCHITECTS • PLANNERS <br />MEMORANDUM <br />1500 Piper Jaffray Plaza <br />444 Cedar Street <br />Saint Paul, MN 55101 -2140 <br />(651) 292-4400 <br />(651) 292.0083 Fax <br />www.tkda.com <br />To: James E. Studenski, P.E. Reference: Engineering Review of <br />City of Lino Lakes, Minnesota New Brighton Kingdom Hall <br />Copies To: Jehovah's Witnesses <br />Project No. 13265.002 <br />From: Patrick M. Windler, P.E. Routing: <br />Date: January 6, 2005 <br />The church members of the New Brighton Kingdom Hall Jehovah's Witnesses are proposing to construct a <br />new worship and meeting facility along the southeast side of Lake Drive (Anoka CSAH 23) and to the north <br />of Second Avenue. This parcel abuts the Rice Lake Wetland and Lake complex on its southeasterly side. <br />The proposed church worship and meeting building will be approximately 4,200 square feet with a drop -off <br />carport. A concrete pavement parking lot capable of handling approximately sixty (60) passenger vehicles is <br />proposed. Water supply (private well) and sanitary sewer (septic tanks /drainfield) systems will be on -site <br />systems as currently no public service is available. <br />The following engineering review is based on the documents as listed below: <br />1. Previous Lino Lakes engineering reviews by Patrick M. Windier, P.E. dated November 1, 2004, and <br />Stephen W. Hartley, P.E. and dated November 4, 2004. <br />2. Cover letter of submitted items from David Knutson of the New Brighton Congregation of Jehovah <br />Witnesses dated December 17, 2004; one page, stamped received in Lino Lakes City offices on <br />December 17, 2004. <br />3. "Wastewater Treatment System - Design #2" by Daniel Weaver of Earth Science Testing and dated <br />November 24, 2004; 14 pages, stamped received in Lino Lakes City offices on December 17, 2004. <br />4. Rice Creek Watershed District permit #04 -150. This is a "Conditional Approval Pending Receipt of <br />Changes" (CAPROC) document from the November 22, 2004, Board Meeting; five pages, stamped <br />received in Lino Lakes City ()tikes on December 17, 2004. <br />5. Two separate easement documents from Pioneer Engineering with no date or signature block, <br />stamped received in Lino Lakes City offices on December 17, 2005 (2 pages). <br />6. "Wetland Delineation Report - Lake Drive NE Site" provided by Pioneer Engineering (Ken Arndt, <br />Wetland Specialist) dated November 8, 2004, stamped received in Lino Lakes City offices on <br />December 17, 2004 (3 pages). <br />An Employee Owned Company Promoting Affirmative Action and Equal Opportunity <br />
The URL can be used to link to this page
Your browser does not support the video tag.