My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03/09/2005 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2005
>
03/09/2005 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2014 3:18:51 PM
Creation date
6/19/2014 8:49:52 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
03/09/2005
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />TKDA <br />ENGINEERS • ARCHITECTS • PLANNERS <br />MEMORANDUM <br />1500 Piper Jaffray Plaza <br />444 Cedar Street <br />Saint Paul, MN 55101 -2140 <br />(651) 292-4400 <br />(651) 292-0083 Fax <br />www.tkda.com <br />To: James Studenski, City Engineer Reference: Apollo Landing/Equinox <br />Copies To: City of Lino Lakes, Minnesota <br />From: Scott A. Brink, P.E. <br />Date: March 4, 2005 <br />Introduction <br />Comm. No. 13265 -002 <br />Routing: <br />A submittal package has been received for a proposed Planned Unit Development Project (PUD) at the <br />northwest corner of the intersection of Apollo Drive and Lilac Drive. The proposed development would <br />essentially consist of five separate buildings of varied types of use (hotel, restaurant, office /retail, <br />office /commercial) on an 8.1 acre site. The following documents have been received: <br />1. Full -size and Half -size plan Sheets (7 sheets), prepared by Mattke Surveying and Engineering, Inc., <br />all received by the City of Lino Lakes February 7, 2005. <br />2. Letter from Mattke Surveying and Engineering, Inc. to the City of Lino Lakes, dated December 4, <br />2004. <br />3. Letter from Mattke Surveying and Engineering, Inc. to the Rice Creek Watershed District, dated <br />February 4, 2005. <br />4. Drainage Calculations dated February 2, 2005. <br />5. Traffic Study dated February 4, 2005, prepared by Bonestroo, Rosene, Anderlik, and Associates <br />6. Geotechnical Report dated January 31, 2005, prepared by Stork Twin City Testing Corporation. <br />Executive Summary <br />Following is a general summary of the main items and issues that must be addressed. Further explanation of <br />these items and additional items to be addressed are provided in the remainder of this review memorandum. <br />1. Drainage Calculations have been received and reviewed, but are not complete. Original drainage <br />calculations performed for Apollo Drive Phase II (by S.E.H., Inc., May 1999) have also been <br />obtained. The applicant must provide the full calculations as explained detailed further in this <br />memorandum. <br />An Employee Owned Company Promoting Affirmative Action and Equal Opportunity <br />
The URL can be used to link to this page
Your browser does not support the video tag.