My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06/08/2005 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2005
>
06/08/2005 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2014 2:37:23 PM
Creation date
6/19/2014 11:02:51 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
06/08/2005
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />LOT 7, <br />4 utm_ <br />EG im I►.iv IlFF <br />© �!!uu r•_ - iii► I�4 <br />RETAIL C <br />M.RREtA,c600 <br />SQ. FT. <br />FFE 909.60 <br />GT <br />RETAIL <br />6,000 <br />SQ. FT. <br />RETAIL D <br />■KEry,,000 <br />SQ. FT. <br />FFE:909.60 <br />m <br />Willi 1119 <br />AlismodllIMMIRMEWM1/ jilt <br />• <br />• <br />_ <br />r 4 i /Mb. r�� ia\ <br />hoillFalrarialEnsd <br />L. r _ -2--L <br />— =— <br />r - l <br />i- e i -6-S r % A i <br />L. DP,1 <br />DECIDIUOUS TREES / SHRUBS / EVERGREENS <br />CODE <br />QTY <br />COMMON NAME/LATIN NAME <br />SIZE <br />ROOT <br />REMARKS <br />AB <br />12 <br />AUTUMN BLAZE MAPLE <br />2" <br />B &B <br />STRAIGHT LEADER <br />ACER FREEMANNI X AUTUMN BLAZE <br />CAL, <br />AND FULL CROWN <br />BN <br />9 <br />RIVER BIRCH <br />10' <br />B &B <br />CLUMP FORM <br />BETULA NIGRA <br />HT <br />CC <br />15 <br />THORNLESS COCKSPUR HAWTHORN <br />1.5" <br />B &B <br />STRAIGHT LEADER <br />CRATAEGUS CRUS -GALIJ VAR. INERMIS <br />CAL. <br />AND FULL CROWN <br />CO <br />3 <br />COMMON HACKBERRY <br />2" <br />B &B <br />STRAIGHT LEADER <br />CELTIS OCCIDENTALUS <br />CAS, <br />AND FULL CROWN <br />FP <br />11 <br />GREEN ASH <br />2 <br />B &B <br />STRAIGHT LEADER <br />FRAXINUS PENNSYLVANICA <br />CAL. <br />AND FULL CROWN <br />FP2 <br />3 <br />MARSHALL'S SEEDLESS ASH <br />2" <br />B &B <br />STRAIGHT LEADER <br />FRAXINUS PENNSYLVANICA 'MARSHALL'S SEEDLESS' <br />CAL. <br />AND FULL CROWN <br />GT <br />12 <br />SKYLINE HONEYLOCUST <br />2" <br />B &B <br />STRAIGHT LEADER <br />GLEDTTSIA TRIACAJTHOS 'SKYLINE' <br />CAL <br />AND FULL CROWN <br />MR <br />22 <br />RED BARRON CRAB <br />2" <br />B &B <br />FUII FORM <br />MALUS 'RED BARRON CRAB' <br />CA .. <br />CB <br />12 <br />SWAMP WHITE OAK <br />2 <br />B &B <br />STRAIGFGHT LEADER <br />R <br />C2 <br />TA <br />6 <br />REDMOND LINDEN <br />B &B <br />STRRAIGHT LEADER <br />TILLIA AMERICANA 'REDMOND' <br />CAL. <br />AND FULL CROWN <br />JS <br />73 <br />SEA GREEN JUNIPER <br />#5 <br />POT <br />FULL FORM <br />JUNIPERUS CHINENSIS SEA GREEN <br />CONT. <br />• <br />• <br />• <br />• <br />• <br />LANDSCAPE NOTES <br />REFER TO 'LIMITS OF IRRIGATION' FOR SOD AND SEED AREAS TO BE IRRIGATED. <br />LANDSCAPE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS OF IRRIGATION <br />PLAN TO THE LANDSCAPE ARCHITECT FOR APPROVAL <br />ALL TREES REMOVED DURING CONSTRUCTION SHALL BE CHIPPED AND STOCKPILED <br />ON SITE FOR USE WHERE SPECIFIED. REMAINING WOOD CHIPS SHALL BE DISPOSED <br />OF OFF SITE. <br />ALL DISTURBED LAWN AREAS ISLANDS TO BE SODDED UNLESS OTHERWISE NOTED. <br />IF CONSTRUCTION OF DEPRESSED ISLAND OCCURS DURING A WET SEASON. EROSION <br />CONTROL BLANKET SHOULD BE USED UNLESS OTHERWISE NOTED. <br />• REFER TO SITE INFILTRATION PLAN SHEET #13 FOR DEPRESSED ISLAND TREATMENT. <br />• ALL EXISTING ASPENS AND COTTONWOODS TO BE CLEARED AND GRUBBED. <br />• ALL OVERSTORY AND UNDERSTORY TREES PLANTED IN SOD AREAS SHALL BE <br />MULCHED W/ A 4' DLA. MULCH CIRCLE TO A DEPTH OF 4' MINIMUM. <br />• ALL SHRUB BEDS TO BE MULCHED AND EDGED WITH POLY EDGER <br />UNLESS LOCATED ADJACENT TO A CURB OR SIDEWALK. <br />• PLAN TAKES PRECEDENCE OVER PLANT SCHEDULE WHERE DISCREPANCIES EXIST. <br />• PROVIDE TRANSRIONAL AREA FROM SODED EDGE TO NATURAL AREAS; A TRANSITION <br />DISTANCE OF 5' TO 10' WILL VARIES WITH SIZE OF ISLAND AND OUTER EDGE. <br />MAY 2 7 2005 <br />CFI' VCFq,j CL.AK <br />N <br />30 80 <br />SCALE IN FEET <br />RYAN' <br />BUILDING LASTING RELATIONSHIPS • <br />RYAN COMPANIES US, INC. <br />50 South Tenth Street, Suite 300 <br />Minneapolis, MN 55403-2012 <br />612 - 492-4000 tel <br />612 - 492-3000 fax <br />W VW.RYANCOMPANIES.COM <br />PROJECT NAME <br />LINO LAKES <br />MARKETPLACE <br />THIRD ADDITION <br />LOCATION <br />LINO LAKES <br />MINNESOTA <br />SHEET TITLE <br />LANDSCAPE PLAN <br />REVISIONS <br />441 -2005 PRELIMINARY SITE PLAN <br />527.2005 REVISED PRELIMINARY <br />SITE PLAN SUBMITTAL <br />1 hereby certify that this plan, specification, <br />or report was prepared by me or under my <br />direct supervision and drat Tam a duly <br />Licensed Landscape Architect under she <br />laws of the State of Minnesota. <br />P TER W. MC ENE 'Y <br />REGISTRATION NO <br />42932 <br />®2005 RYAN COMPANIES US, N+C. <br />5/27/05 <br />JOB NUMBER HISTORY <br />SHEET NUMBER <br />L1.1 <br />DRAWN BY <br />MAN <br />JOB NUMBER <br />1221-001 <br />CHECIED BY <br />PAM <br />DATE <br />5/27/2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.