My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/10/2005 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2005
>
08/10/2005 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2014 2:20:33 PM
Creation date
6/19/2014 11:47:36 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
08/10/2005
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />Pine Glen <br />page 6 <br />9. City native seed mix must be used in all drainage ponds and wet areas and a 3 <br />year management plan must be established with a reputable management <br />company. <br />10. Right of way for Lake Drive shall be dedicated as 60 feet from centerline. <br />11. A 15 foot wide trail easement along Lake Drive will need to be dedicated to <br />the city prior to the City Council approving any final plat for the project. This <br />easement will need to be outside the ultimate right -of -way width for Lake <br />Drive. <br />12. A sidewalk or trail connecting the private trail system to the commercial site <br />and ultimately to the Lake Drive trail must be built as a part of the first phase <br />of this development. <br />13. The project is subject to Rice Creek Watershed review and approval. <br />14. The project is subject to Anoka County Highway Department review and <br />approval. <br />15. A temporary cul -de -sac must be provided at the southern terminus of Street C. <br />16. Plans depicting the integration of Street A into Lois Lane must be submitted <br />and approved by the City Engineer. <br />17. The upland area of all lots must be confirmed to meet the 10,800 square foot <br />requirement prior to the preliminary plat being reviewed by the City Council. <br />ATTACHMENTS <br />1. City Engineers comments dated August 5, 2005. <br />2. Environmental Board comments dated August 3, 2005. <br />3. Pine Glen Preliminary Plat packet submitted July 07, 2005. <br />
The URL can be used to link to this page
Your browser does not support the video tag.