Laserfiche WebLink
Pine Glen <br />page 4 <br />Utilities: The revised layout has not been completely engineered by the applicant, <br />since they wanted to make sure the layout was acceptable to the board prior to spending <br />the money on creating additional plans. Revised engineering plans will be required prior <br />to the item going to the City Council and will need to address all of the City Engineer's <br />comments from the previous plan, as well as continue to meet all city standards. <br />Appropriate drainage and utility easements will need to be shown on both the commercial <br />and residential lots prior to approval by the City Council. <br />The lift station for the project must be shown within a 50' x 50' utility easement. <br />Grading and Stormwater Management: The city engineer reviewed the previous <br />submittal and his comments are attached. The revised layout will require a new set of <br />plans that meet all of the previous comments, as well as conform to all city standards. <br />Parks, Open Space: The proposal does not include any land dedication for parkland, <br />only a cash dedication will be required. Park dedication fees are $2,075 per residential <br />unit and $2,175 per commercial acre. <br />The City of Lino Lakes Parks, Natural Open Space /Greenways and Trail System Plan <br />indicates a trail along the Lake Drive frontage that is not currently indicated on the <br />proposed plans. A 15 foot wide trail easement will need to be dedicated to the city prior <br />• to any final plat being approved by the City Council. <br />The proposal does include a private trial system running along the south side of the <br />property, which will link the homeowner's on the west side of the site to the <br />greenway /open space on the east side of the project. The Park Board is going to review <br />the potential for the trail at a future meeting. Staff is currently recommending that this <br />trail be continued through the commercial portion of the site to the Lake Drive trail. <br />• <br />The eastern portion of the site is partially indicated as a greenway area on the City of <br />Lino Lakes Parks, Natural Open Space /Greenways and Trail System Plan. It also <br />indicates a potential trail connection to the north to link up to the city park at old city hall. <br />The applicant has previously discussed turning over the large greenway to the city. Staff <br />is recommending this as a condition, with the stipulation that it will not reduce the park <br />dedication fees required as part of the project. <br />ENVIRONMENTAL BOARD <br />The Environmental Board reviewed the project on July 27, 2005. The recommendations <br />are attached and a number of the comments have been included as conditions of approval <br />with this staff report. Including a conservation easement over the wetland portion of the <br />site; native seed mix plantings with a three year management contract; a homeowner's <br />association; City boulevard trees; and review of the commercial areas to require <br />conformance with city standards. <br />