My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12/14/2005 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2005
>
12/14/2005 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2014 12:50:28 PM
Creation date
6/20/2014 12:00:36 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
12/14/2005
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Signage <br />•The submittal includes minimal signage, and with the recent amendments to the signage ordinance would be <br />well within the regulations. All signage will be reviewed at time of building permit and will be required to meet <br />the requirements of the signage ordinance. <br />Trash / Mechanical Equipment <br />The trash enclosure is set away from the building towards the north end of the driveway. This location directs <br />the opening to the cul -de -sac making it quite visible and difficult to properly screen. Staff is recommending a <br />condition that it be moved to a location closer to the main structure; that it be constructed of complementary <br />materials; and that the opening be directed away from the cul -de -sac. <br />Engineering <br />The City Engineer has thoroughly reviewed the submitted plans and his comments are attached in memorandum <br />form. A condition of this approval will require compliance with these comments. <br />The Rice Creek Watershed District has completed a review of the overall industrial park; as well as issued a <br />CAPROC (Conditional Approval Pending Receipt of Changes) for the Pomp's Tire facility. <br />OPTIONS <br />1. Recommend approval of the Conditional Use Permit for Pomp's Tire <br />2. Recommend denial of the Conditional Use Permit for Pomp's Tire <br />3. Return to staff with direction. <br />RECOMMENDATION <br />Staff recommends approval of the request subject to the conditions of the conditional use as listed within the <br />body of the staff report, as well as the following conditions related to the development of the site: <br />1. A performance agreement must be executed between the developer and the city prior to issuance of <br />building permits. <br />2. Issues discussed in the City Engineer review memo must be addressed to his satisfaction. <br />3. All lighting fixtures must be shoebox, downcast fixtures in accordance with the requirements of <br />Subdivision 4, Section F of the zoning ordinance. <br />4. The trash enclosure must be relocated, properly screened, and constructed of complementary materials <br />as required by Section 8, Subdivision 1. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.