My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03/08/2006 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2006
>
03/08/2006 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2014 12:32:15 PM
Creation date
6/20/2014 2:22:43 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
03/08/2006
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />Pheasant Stroll Estates <br />page 4 <br />on the plans will need revision. The Rice Creek Watershed District cannot confirm the <br />wetland delineation until spring. <br />The City supports surface filtration and other means of treating runoff, though the <br />proposed design may need some revisions. <br />Landscaping: We require landscaping along collector and arterial roads in new <br />subdivisions to buffer homes form the roads. <br />Park Dedication: Park dedication would be cash: $2075 per new dwelling unit. <br />ENVIRONMENTAL BOARD <br />The Environmental Board reviewed the application on February 22. The comments are <br />attached. As the design evolves, we will examine how to implement appropriate <br />recommendations. <br />OPTIONS <br />1. Approve rezoning, preliminary plat, and MUSA allocation. <br />2. Deny rezoning, preliminary plat, and MUSA allocation. <br />3. Continue public hearing to allow for further discussion on meeting infrastructure <br />needs and other issues. <br />RECOMMENDATION <br />Option 3 <br />This report is based on the following documents: <br />• Boundary and Topographic Survey, 1/30/06, received Feb 3, 2006 <br />• Resource Inventory, Tree Inventory 1/30/06, received Feb 3, 2006 <br />• Preliminary Plat, 1/30/06, received Feb 3, 2006 <br />• Preliminary Grading Plan, 1/30/06, received Feb 3, 2006 <br />• Preliminary Utility Plan, 1/30/06, received Feb 3, 2006 <br />• SWPPP, 1/30/06, received Feb 3, 2006 <br />• • Building elevations received Feb 3, 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.