Laserfiche WebLink
• <br />• Remove shallow marsh restoration from the plan. <br />• Acceptable signage should be placed at the conservation easement <br />boundaries of each lot. <br />• Storm Water Pollution Plan should have a name and a number placed on <br />it for 7 days a week contact purposes. <br />• Add one boulevard tree per frontage if there is room to do so. <br />• Page 3 <br />