My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10/11/2006 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2006
>
10/11/2006 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2014 11:24:33 AM
Creation date
6/23/2014 3:14:17 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
10/11/2006
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•reliminary Plat <br />Lots: The lots will be 132 feet in depth. The minimum lot depth in an R -1 zone is 135 feet. When the Mar <br />Don Acres lots were platted, they were 294' deep. The 30' easement on the north edge, which now includes <br />Arlo Lane, reduces the depth to 264'. Half of that is 132'. It is impossible to know why the extra six feet was <br />not planned for when Mar Don Acres was platted. However, it is clear that the intent was to plan for a road on <br />the north side, and a 30' easement was platted. The construction of Arlo Lane fulfilled that plan for a street. <br />The City approval of the creation of Arlo Lane was an acknowledgement of the intent to provide the <br />opportunity for the Mar Don Acres lot to subdivide. In order to fulfill this, the lots must be smaller than 135' in <br />depth. The locations of Arlo and Lois Lanes prevent larger lots. It may be possible to add three feet onto one <br />row of lots and make the other row 129', though the value of such a change is questionable. Therefore staff <br />finds the minor deviation of less than 3% to be acceptable. <br />Lot 2 will be 77.5 feet in width and consist of 10,230 square feet. The minimum lot width in an R -1 zone is 80 <br />feet (though lots of 1.5 acres or more are allowed to be re- subdivided at a width of 75 feet) and the minimum lot <br />size is 10,800 square feet. The existing home that will remain on lot 1 is the cause for this deviation. In order <br />to provide an appropriate setback (the applicant has proposed 6.27 feet, which is explained in the Setback <br />section below) the applicant is proposing to reduce the lot width and area of Lot 2 so that the existing dwelling <br />can remain on Lot 1. This is a reduction of 3% and 5% respectively; therefore staff sees this as an acceptable <br />minor deviation of the code requirements. <br />Wetbacks: The applicant is proposing to deviate from the 10 foot side setback required for principal buildings <br />I the R -1 zone. Considering the location of the existing dwelling; strict application of the 10 foot setback <br />would limit Lot 2 to a width of 73.5 feet and an area of 9,702 square feet. Therefore the applicant is proposing <br />a 6.27 foot side setback, which is slightly greater than the five feet that is required for accessory structure and <br />will therefore maintain a minimum of ten feet separation between the existing dwelling and the home <br />constructed on Lot 2. Considering this structure will exist when Lot 2 is developed, this reduction in setback <br />will not have a negative effect on the surrounding properties. <br />Streets: Arlo Lane, Lois Lane and Country Lane all are existing roads. No additional roads are being <br />proposed. The existing road system can accommodate the traffic generated by the new homes. <br />As part of the final plat, the developer must dedicate the Arlo Lane right of way. This will fulfill the intent of <br />the City when Mar Don Acres was platted. Arlo Lane exists now, and the dedication is more of a formality. <br />Park Dedication: The current subdivision ordinance includes park dedication in the amount of $2075 per <br />residential unit, less any land dedication. There is no land dedication needed, as Highland Meadows Park is <br />nearby. The park dedication will be $2,075 x 3 new home lots = $6,225. <br />Utilities: Sanitary sewer and water is already in place in Arlo Lane and is being installed in Lois Lane <br />presently. All of the proposed lots, including the existing home, must connect to utilities. Onsite septic systems <br />must be abandoned according to law. In addition, existing wells likely will have to be capped because of <br />proximity to new sanitary sewer lines. These and other issues discussed in the City Engineer review memo <br />*must be addressed to his satisfaction. <br />Grading: The grading plan has been reviewed by the City Engineer and his comments will need to be <br />addressed to his satisfaction prior to the site being developed. <br />The plan is also subject to review and approval from the Rice Creek Watershed District. <br />
The URL can be used to link to this page
Your browser does not support the video tag.