My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11/08/2006 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2006
>
11/08/2006 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2014 11:09:20 AM
Creation date
6/23/2014 3:48:52 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
11/08/2006
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• From the full access on Hodgson, a circulation route is to be created leading east of <br />Hodgson to the access point on Ware Rd., providing access to all properties in the <br />area. This should be a public road. However, an access drive with mutual easements <br />across properties is a possible solution if it provides adequate access and circulation. <br />• West of Hodgson Rd., there is to be one access onto CR J, located as far west as <br />possible from the Hodgson/CR J intersection. This new access is to be constructed as <br />right in/right out only. This will be a driveway into the development site , and there <br />will be access easements on that site to provide access to, from, and through property <br />to the north, leading to the full access on Hodgson. No other new accesses are to be <br />allowed. The City will work toward eliminating all other accesses along CR J. <br />• The access points, right of way, and internal circulation routes noted above are to create a <br />circulation network serving all properties in the study area rather than individual <br />driveways onto arterial and collector roads that serve only individual properties. <br />• For properties on the eastern edge of the study area, access to Ware Road is a possibility <br />if the City judges the design to be safe. This does not preclude the need for public right <br />of way or easements elsewhere. <br />• The Hodgson/CR J intersection is to be signalized prior to or as part of any significant <br />development in the study area. This is to be a cooperative effort of Anoka and Ramsey <br />Counties and the Cities of Lino Lakes and Shoreview. <br />• Other road improvement needs such as additional lanes, median, and the like will be <br />designed in cooperation with Anoka County, Ramsey County, and Shoreview as <br />appropriate. <br />• The quantity of development of the area will be limited to ensure that traffic generation <br />does not exceed the capacities of Hodgson Road, the intersection with Co Rd J, or the <br />new access. Development shall not create the need for a traffic signal at the new full <br />access on Hodgson Road. <br />• Planning for the area must look forward to full development of the study area so as <br />not to allow one project to "use up capacity" so that other sites cannot develop <br />without creating the need for a signal at the new access. <br />• Right of way will be dedicated with development to ensure adequate right of way for <br />Hodgson and CR J as well as for the internal circulation system, as necessary. <br />Trails, Open Space <br />• A trail connection, included as an `enhancement corridor' in the Parks, Natural Open <br />• Space /Greenways and Trail System Plan, will be established across the study area. This <br />Draft: October 31, 2006 Hodgson/CR J Master Plan page 32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.